Entry 19: GOCE meets launcher Upper Stage

529 views 0 likes
ESA / Applications / Observing the Earth / FutureEO / GOCE

6 March 2009: As the end of another busy week draws to a close, the slim five-metre long GOCE satellite has undergone its last major handling operation by being hoisted up and joined to the Breeze-KM Upper Stage of the Rockot launcher.

This significant milestone in the launch campaign follows a number of intricate tasks. On Monday 2 March, the spacecraft was transferred onto the adapter system and tension applied to the clamp band – a process that can take a couple of goes to get it right. However, after being left to stabilise overnight the tension was checked the following morning and found to be fine, so the team could move onto the next task in hand.

Transferring GOCE to the Upper Stage
Transferring GOCE to the Upper Stage

The next job was to inspect the spacecraft and remove all the so-called 'red-tag' items, which are things such as protection covers that must be removed before encapsulation. Needless to say, this means that multiple checks are performed by different people to ensure that everything has been removed.

In parallel, the fairing halves – that had been readied by Khrunichev over the last few days – were thoroughly inspected for cleanliness and found to be okay.

On Thursday, the spacecraft and adapter system were moved out of the cleanroom to the nearby airlock via the 'yellow trolley', which was hand-operated by Khrunichev staff. The spacecraft was then lifted and mated onto the Breeze Upper Stage. This was the last handling operation on the spacecraft.

GOCE gently joins the Upper Stage
GOCE gently joins the Upper Stage

This procedure went very well and the team was excited to see the Upper Composite taking shape - one more step closer to launch just ten days away. On the same day, the umbilical cables were connected and the spacecraft turned on to verify the connection with the Upper Stage - all was fine.

Related Links

Related Links

GOCE in ESA's test facilities
Applications

Entry 1: GOCE prepares for shipment to Russia

981 views 0 likes
Read
GOCE
Applications

Entry 2: GOCE begins its journey to launch site

1229 views 0 likes
Read
Safe arrival for GOCE at Arkhangelsk
Applications

Entry 3: GOCE arrives safely at launch site in Russia

980 views 0 likes
Read
GOCE positioned for alignment check
Applications

Entry 4: GOCE unpacked and alignment check complete

750 views 0 likes
Read
Into container to check for gas leaks
Applications

Entry 5: GOCE checked for gas leaks

800 views 0 likes
Read
Manoeuvring GOCE in the cleanroom
Applications

Entry 6: Launch team reaches full strength

597 views 0 likes
Read
Roll out of Upper Composite
Applications

Entry 7: Gradiometer checked and launcher rolled out for te…

608 views 0 likes
Read
GOCE joining Breeze
Applications

Entry 8: GOCE satellite joins Breeze

555 views 0 likes
Read
Last look at GOCE
Applications

Entry 9: Last-ever look at GOCE

609 views 0 likes
Read
GOCE on the launch pad
Applications

Entry 10: GOCE on the launch pad

717 views 0 likes
Read
GOCE positioned for alignment check
Applications

Entry 11: Launch of GOCE delayed

586 views 0 likes
Read
GOCE before joining the adaptor
Applications

Entry 12: Satellite activities resume 24 September

590 views 0 likes
Read
Fairing with logos
Applications

Entry 13: GOCE team gearing up for new launch date

518 views 0 likes
Read
Manoeuvring GOCE in the cleanroom
Applications

Entry 14: GOCE launch postponed

482 views 0 likes
Read
GOCE in Plesetsk
Applications

Entry 15: March launch planned for GOCE

447 views 0 likes
Read
GOCE container
Applications

Entry 16: Team make ready to wake up GOCE

509 views 0 likes
Read
Applications

Entry 17: GOCE revealed as container opened

551 views 0 likes
Read
Activating the ion propulsion valves
Applications

Entry 18: A busy week

767 views 0 likes
Read
GOCE mated to the Breeze Upper Stage
Applications

Entry 19: GOCE meets launcher Upper Stage

529 views 0 likes
Read
Last inspection before fairing closes
Applications

Entry 20: Encapsulation

505 views 0 likes
Read
Transfer of GOCE to launch tower
Applications

Entry 21: On the launch pad

805 views 0 likes
Read
ESA and industrial team members during GOCE countdown rehearsal, Plesetsk, 13 March 2009
Applications

Entry 22: Launch rehearsed

528 views 0 likes
Read
GOCE liftoff
Applications

Entry 23: GOCE launched and in orbit

1477 views 3 likes
Read
Cleanroom used for storage
Applications

Entry 24: Going home

843 views 1 likes
Read
Plesetsk Cosmodrome
Agency

Plesetsk

8247 views 5 likes
Read