Entry 8: GOCE satellite joins Breeze

555 views 0 likes
ESA / Applications / Observing the Earth / FutureEO / GOCE

29 August 2008 – It's been a busy week, all the electrical tests on the satellite have been completed, the countdown procedure has been rehearsed and GOCE is now in the process of being joined to the Breeze-KM Upper Stage of the Rockot launcher.

With launch just 10 working days away (L-10) activities at the Plesetsk Cosmodrome have been progressing very well. The first part of the week was dedicated to finishing off the electrical tests along with some mechanical checks. This also included removing so-called 'red tag items', which are components attached to the spacecraft for testing and protection but are removed once they are not needed anymore. Needless to say, all these red tag items have to be removed before the satellite is encapsulated in the fairing – which will be next week.

GOCE before joining the adaptor
GOCE before joining the adaptor

An important exercise also took place at the beginning of the week – that being the rehearsal of the countdown procedure with ESA's Spacecraft Operations Centre (ESOC) in Darmstadt, Germany. The purpose of this procedure is to verify that all the communication links work correctly and that the procedure is thoroughly tested.

Following the successful countdown rehearsal, the rest of the week has been dedicated to activities relating to joining the GOCE satellite to the upper stage of the Rockot launcher. This started with fixing GOCE to the clamp band part of the adapter, which forms the interface between the Breeze-KM Upper Stage. This was successfully completed by the evening of Wednesday 27 August and was followed by a series of electrical tests to make sure the connections were all okay. For this the satellite was 'switched on', which showed that everything was connected up properly.

GOCE mated to the Upper Stage adapter
GOCE mated to the Upper Stage adapter

The two half-shells of the fairing are currently being prepared to encapsulate GOCE for launch. This will happen on Sunday and will effectively be the last time the team lay eyes on ESA's gravity satellite.

Related Links

GOCE in ESA's test facilities
Applications

Entry 1: GOCE prepares for shipment to Russia

981 views 0 likes
Read
GOCE
Applications

Entry 2: GOCE begins its journey to launch site

1229 views 0 likes
Read
Safe arrival for GOCE at Arkhangelsk
Applications

Entry 3: GOCE arrives safely at launch site in Russia

980 views 0 likes
Read
GOCE positioned for alignment check
Applications

Entry 4: GOCE unpacked and alignment check complete

750 views 0 likes
Read
Into container to check for gas leaks
Applications

Entry 5: GOCE checked for gas leaks

800 views 0 likes
Read
Manoeuvring GOCE in the cleanroom
Applications

Entry 6: Launch team reaches full strength

597 views 0 likes
Read
Roll out of Upper Composite
Applications

Entry 7: Gradiometer checked and launcher rolled out for te…

608 views 0 likes
Read
GOCE joining Breeze
Applications

Entry 8: GOCE satellite joins Breeze

555 views 0 likes
Read
Last look at GOCE
Applications

Entry 9: Last-ever look at GOCE

609 views 0 likes
Read
GOCE on the launch pad
Applications

Entry 10: GOCE on the launch pad

717 views 0 likes
Read
GOCE positioned for alignment check
Applications

Entry 11: Launch of GOCE delayed

586 views 0 likes
Read
GOCE before joining the adaptor
Applications

Entry 12: Satellite activities resume 24 September

590 views 0 likes
Read
Fairing with logos
Applications

Entry 13: GOCE team gearing up for new launch date

518 views 0 likes
Read
Manoeuvring GOCE in the cleanroom
Applications

Entry 14: GOCE launch postponed

482 views 0 likes
Read
GOCE in Plesetsk
Applications

Entry 15: March launch planned for GOCE

447 views 0 likes
Read
GOCE container
Applications

Entry 16: Team make ready to wake up GOCE

509 views 0 likes
Read
Applications

Entry 17: GOCE revealed as container opened

551 views 0 likes
Read
Activating the ion propulsion valves
Applications

Entry 18: A busy week

767 views 0 likes
Read
GOCE mated to the Breeze Upper Stage
Applications

Entry 19: GOCE meets launcher Upper Stage

529 views 0 likes
Read
Last inspection before fairing closes
Applications

Entry 20: Encapsulation

505 views 0 likes
Read
Transfer of GOCE to launch tower
Applications

Entry 21: On the launch pad

805 views 0 likes
Read
ESA and industrial team members during GOCE countdown rehearsal, Plesetsk, 13 March 2009
Applications

Entry 22: Launch rehearsed

528 views 0 likes
Read
GOCE liftoff
Applications

Entry 23: GOCE launched and in orbit

1477 views 3 likes
Read
Cleanroom used for storage
Applications

Entry 24: Going home

843 views 1 likes
Read
Plesetsk Cosmodrome
Agency

Plesetsk

8247 views 5 likes
Read