United space in Europe
The upper stage and Integral spacecraft ready for the transfer
Enabling & Support

The upper stage and Integral spacecraft ready for the transfer

08/10/2002 191 views 0 likes 198454 ID
  • HI-RES JPEG [855.59 kB]

Thank you for liking

You have already liked this page, you can only like it once!

Once complete, the space head unit was lifted on 8 October by 2 cranes and loaded on a railcar, for transport to the Launcher Integration Building.
Integral is scheduled for launch from Baikonur in Kazakhstan on 17 October 2002.

  • ESA-S.Corvaja
  • Space Science Space Engineering
  • INTEGRAL
  • Spacecraft engineering Astronomy techniques
The upper stage and Integral spacecraft ready for the transfer
Enabling & Support

The upper stage and Integral spacecraft ready for th…

Image 209 views 0 likes
Transferring GOCE to the Upper Stage
Applications

Transferring GOCE to the Upper Stage

Image 216 views 0 likes
The cryogenic upper stage of the Ariane 5 ready for mating with the main cryogenic stage
Enabling & Support

The cryogenic upper stage of the Ariane 5 ready for…

Image 350 views 3 likes
Upper stage of Ariane 5 integration
Science & Exploration

Upper stage of Ariane 5 integration

Image 360 views 1 likes
Upper stage of Ariane 5 integration
Science & Exploration

Upper stage of Ariane 5 integration

Image 403 views 1 likes