United space in Europe
Applications

Closing of Proba-V's final panel

18/04/2013 1032 views 7 likes 290106 ID
  • HI-RES JPG [2.03 MB]

Thank you for liking

You have already liked this page, you can only like it once!

Following its arrival in S5C, Proba-V’s final battery mating and closing of its last panel took place on 4 April. This marked the last time the team could see inside the satellite. 

  • ESA - Karim Mellab
  • Observing the Earth Technology
  • Proba-V
  • Proba-V
Applications

Placing Proba-V onto its separation system

Image 865 views 6 likes
Applications

Proba-V attached to separation system

Image 1025 views 7 likes
Applications

Connected up in S5C

Image 416 views 1 likes
Enabling & Support

Floodlit satellite during illumination test

Image 397 views 2 likes
Proba-V unpacked for integration
Applications

Proba-V unpacked for integration

Image 401 views 7 likes