Opening of the Proba-2 satellite container in the cleanroom
Enabling & Support

Entry 4: Proba-2 unloaded and ready for inspection

213 views 0 likes
ESA / Enabling & Support / Space Engineering & Technology / Proba Missions

5 September 2009 – Another day of unpacking. The team splits into two: one half prepares the clean room for the satellite while the other readies the electrical ground support equipment (EGSE) test room. Thanks to some creative packing the team had managed to squeeze all the test equipment required into the space left over by the flight's main passenger.

Due to the very clean conditions of the clean room – despite all the moving activities of the previous day – the team were able to open the spacecraft container ahead of schedule. By 17:00 the spacecraft had been unloaded and placed upon its integration table.

Seeing Proba-2 in its final resting place before heading into space represented a very exciting moment after years of hard work. The perfect conclusion to a hectic but fulfilling day.

Related Links

Proba-2, final checks
Enabling & Support

Entry 1: Belgium says goodbye to Proba-2

269 views 0 likes
Open item
Loading of Proba-2 container in cargo plane at Brussels airport
Enabling & Support

Entry 2: Proba-2's journey to Plesetsk

256 views 0 likes
Open item
Transport of Proba-2 container to the MIK
Enabling & Support

Entry 3: Unpacking after the trip

196 views 0 likes
Open item
Opening of the Proba-2 satellite container in the cleanroom
Enabling & Support

Entry 4: Proba-2 unloaded and ready for inspection

213 views 0 likes
Open item
Hoisting of satellite from its container and assembly of integration dolly
Enabling & Support

Entry 5: Proba-2 powered up

266 views 0 likes
Open item
Inspection of Proba-2 internal compartments
Enabling & Support

Entry 6: End-to-end testing

277 views 0 likes
Open item
Filling of the propulsion tank with xeon
Enabling & Support

Entry 7: Filling Proba-2 up with xenon

252 views 0 likes
Open item
Mounting of the first deployable solar panel
Enabling & Support

Entry 8: Proba-2 gains a solar panel

321 views 0 likes
Open item
Mounting of solar panel
Enabling & Support

Entry 9: Proba-2 gains its second ‘wing’

217 views 0 likes
Open item
Proba-2 with solar panels mounted
Enabling & Support

Entry 10: Completing Proba-2

217 views 0 likes
Open item
Proba-2 final full functional test
Enabling & Support

Entry 11: Putting Proba-2 to the test

236 views 0 likes
Open item
Proba-2 launch team group picture at the museum
Enabling & Support

Entry 12: Checking launch tower links

217 views 0 likes
Open item
Proba-2 back in its storage container in the cleanroom
Enabling & Support

Entry 13: Letting SMOS take its turn

211 views 0 likes
Open item
Proba-2 team arrival at Plesetsk Cosmodrome
Enabling & Support

Entry 14: Second phase of Proba-2 launch campaign begins

238 views 0 likes
Open item
ESP mounting on the final panel
Enabling & Support

Entry 15: Last bolts tightened on Proba-2

243 views 0 likes
Open item
Proba-2
Enabling & Support

Entry 16: A short journey off the ground – Proba-2 mated to…

223 views 0 likes
Open item
Proba-2 in its final launch position, on top of Breeze
Enabling & Support

Entry 17: Proba-2 mated onto Breeze upper stage

290 views 0 likes
Open item
Removal of Proba-2 protective covers
Enabling & Support

Entry 18: Encapsulated, Proba-2 vanishes from view forever

218 views 0 likes
Open item
Encapsulation
Enabling & Support

Entry 19: Proba-2 in place and powered up

223 views 0 likes
Open item
SMOS, Proba-2 and Khrunichev teams
Enabling & Support

Entry 20: Rail ride to the launch pad

243 views 0 likes
Open item
Joined dress rehearsal of Proba-2 and SMOS in MCC
Enabling & Support

Entry 21: Far-flung dress rehearsal for launch

465 views 0 likes
Open item