• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • ATV

    • International Space Station

    • Human Spaceflight and Exploration

    • Flight plan
    • ATV mission concept
    • ATV flight phases
    • ATV cargo capacity
    • Spacecraft
    • ATV configuration
    • ATV Integrated Cargo Carrier
    • ATV Service Module
    • ATV evolution
    • ATV Missions
    • ATV-1: Jules Verne
    • ATV-2: Johannes Kepler
    • ATV-3: Edoardo Amaldi
    • ATV-4: Albert Einstein
    • Operations
    • Flight operations
    • ATV Control Centre
    • Crew role
    • Industry
    • ESA's role
    • European industry
    • ATV Downloads

      • Downloads
      • ATV Edoardo Amaldi factsheet English (pdf)
      • ATV Edoardo Amaldi factsheet French (pdf)
      • ATV Edoardo Amaldi factsheet Italian (pdf)
      • ATV Edoardo Amaldi factsheet German (pdf)
      • ATV Edoardo Amaldi info kit English (pdf)
      • ATV Edoardo Amaldi info kit Italian (pdf)
      • ATV Edoardo Amaldi info kit French (pdf)
      • ATV Edoardo Amaldi info kit German (pdf)
      • ATV Edoardo Amaldi info kit Russian (pdf)
      • ATV: Servicing the International Space Station (pdf)
      • ATV-3 Poster
      • ATV-3 Panels
    • Multimedia gallery
    • ATV image gallery
    • ATV video gallery
    • ATV on Flickr
    • Services

    ESA > Our Activities > Human Spaceflight > ATV

    Busy first days for ATV Edoardo Amaldi

    André Kuipers inside ATV-3
    3 April 2012

    Just two days after a flawless docking with the ISS on 29 March, ESA's third ATV has conducted its first 'test' reboost, proving that it is fully integrated with the Station and ready to perform orbit boosts and manoeuvres if necessary.

    ESA's ATV Edoardo Amaldi completed a technically perfect automated docking with the Russian Zvezda module of the International Space Station (ISS) at 00:31 CEST on 29 March. The procedure was monitored by ESA astronaut André Kuipers and Russian cosmonaut Oleg Kononenko from inside the ISS and by the ESA/CNES mission operations team at the ATV Control Centre, Toulouse.

    Docking marked the start of an intensive period of activity to open the hatch, enter ATV and confirm that all its systems were operating normally and were fully integrated with the data, electrical and other systems of the ISS.

    Crew enters ATV for the first time

    Kuipers and Kononenko during ATV-3 docking

    Hatch opening and first ingress took place at 16:15 CEST, and the crew installed an air scrubber to remove any contaminants that may have come loose inside ATV's pressurised cargo area.

    Early on 30 March, the crew also installed the Russian POTOK air filter unit as a measure against any bacterial contamination that may have occurred on ground before the hatch was closed for launch.


    Electrical fault triggers circuit breaker

    ATV Edoardo Amaldi approaches ISS

    At 03:39 CEST, the ATV experienced a fault in one of the two channels of the onboard electronics system that controls its electrical power connections to the Zvezda module.

    "The ATV system is designed to handle this kind of failure so it promptly shut down the faulty equipment and made sure everything was safe," said ESA's Charlotte Beskow, ATV Operation Interface Manager.

    "It's a bit like when you blow a fuse at home, you do not know exactly what went wrong but your house is safe."

    Later, ground teams sent commands that isolated ATV's electrical systems from the rest of the Station.

    First image of Kuipers inside ATV-3

    "As a precaution, the crew were asked to begin unloading priority cargo, in case the ISS power supply to ATV could not be re-established and — in the worst case of onboard autonomous power shortage — if we had to undock," says Massimo Cislaghi, ESA's ATV-3 Mission Manager.

    "This would have been necessary in case of additional ATV onboard anomalies, while in the nominal case the amount of power ATV can generate from its own solar arrays would have still been sufficient for a long time even without ISS power."

    After consultations between the crew, ATV Control Centre and the ISS Mission Control Centres in Houston and Moscow, the ATV power connection to the ISS was switched to a redundant channel. Power from the ISS to ATV was re-established at 19:03 CEST on 31 March.

    Teams are investigating the problem to determine the cause of the electrical fault.

    First Station boost using ATV thrusters

    ATV-3 unloading

    Once the power issue was resolved, mission controllers at ATV-CC began working on the first 'test' reboost of the ISS, conducted during the evening of 31 March.

    ATV's thrusters ran for 351 seconds, increasing ISS velocity by 1.0 m/s and boosting average altitude by 1.73 km.

    "In the boost test, ATV thrusters are commanded by the Russian computers inside the Zvezda module," says Charlotte Beskow.

    "This is a standard test performed as soon as possible after docking."

    The successful test burn means that ATV is ready for a series of larger planned reboosts (the first expected on 5 April) and to conduct debris avoidance manoeuvres when necessary.    

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    42
    facebook
    twitter
    reddit
    google plus
    digg
    tumbler
    digg
    blogger
    myspace
    • Automated Transfer Vehicle
    • Follow the ATV Johannes Kepler misison via ESA's ATV blog
      Follow the ATV Johannes Kepler misison via ESA's ATV blog
      ATV blog
    • Videos
    • Watch full launch retransmission
    • ATV-3 docking
    • Watch full docking retransmission
    • More news
      • Mission accomplished for ATV Edoardo Amaldi
        • ATV undocked
          • ATV-3 set for overnight undocking
            • So long… and thanks for all the oxygen
              • Learn to dock ATV the astronaut way
                • Busy first days for ATV Edoardo Amaldi
                  • ATV music video: Back at the ISS
                    • Artemis: the ATV whisperer
                      • Europe’s third cargo vehicle docks with the Space Station
                        • Europe’s smart supply ship on its way to Space Station
                          • ATV-3 launch
                            • Crucial first steps in ATV’s orbital journey
                              • ATV Edoardo Amaldi set for liftoff
                                • ATV-3 launch preparations going on
                                  • New target launch date for ATV-3
                                    • ATV launch delayed
                                      • Europe’s ATV space ferry set for launch to Space Station
                                        • ATV Edoardo Amaldi arrives in Kourou
                                        • Related documents
                                        • ATV Factsheet
                                        • ATV-3 Edoardo Amaldi mission logo
                                          ATV-3 Edoardo Amaldi mission logo
                                          ATV-3 Mission logo
                                        • Multimedia
                                        • ATV on Flickr
                                        • ATV-3 Poster
                                        • ATV video gallery

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · CryoSat hits land
    • · Ariane 5 completes seven launches …
    • · Measuring skull pressure without t…
    • · Malargüe station inauguration
    • · The solar wind is swirly
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions