• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • ATV

    • International Space Station

    • Human Spaceflight

    • Flight plan
    • ATV mission concept
    • ATV flight phases
    • ATV cargo capacity
    • Spacecraft
    • ATV configuration
    • ATV Integrated Cargo Carrier
    • ATV Service Module
    • ATV evolution
    • ATV Missions
    • ATV-1: Jules Verne
    • ATV-2: Johannes Kepler
    • ATV-3: Edoardo Amaldi
    • ATV-4: Albert Einstein
    • ATV-5: George Lemaître
    • Operations
    • Flight operations
    • ATV Control Centre
    • Crew role
    • Industry
    • ESA's role
    • European industry
    • ATV-4 downloads

      • ATV-4 mission brochure English
      • ATV-4 mission brochure German
      • ATV-4 mission brochure French
      • ATV-4 mission brochure Italian
      • ATV-4 mission brochure Russian
    • Multimedia gallery
    • ATV image gallery
    • ATV video gallery
    • ATV on Flickr

    ESA > Our Activities > Human Spaceflight > ATV

    Follow the Jules Verne ATV docking

    Jules Verne during Demo Day 2
    Jules Verne ATV approaches the ISS during Demonstration Day 2 manoeuvres, 31 March 2008
    3 April 2008

    Follow the first docking attempt of Jules Verne, ESA’s first Automated Transfer Vehicle, live on the ESA website. Watch the Video replay of the docking. For realtime updates from inside the ATV Control Centre in Toulouse visit the ATV blog.

    Contact of the vessel's docking probe is expected at 16:40 CEST (14:40 UT), with full capture scheduled at 17:14 CEST (15:14 UT).

    The rendezvous and docking will be broadcast live by ESA TV, 16:00-17:15 CEST (14:00-15:15 UT); details are available on the ESA TV web page under http://television.esa.int/.

    If the docking does not occur for any reason, the next possible window occurs 48 hours later on Saturday 5 April. The rendezvous and docking will be monitored from ESA's ATV Control Centre in Toulouse, France, in cooperation with the Russian control centre in Moscow and the NASA control centre in Houston.

    Full schedule

    Note: Times have changed slightly compared to previously published schedule. Times remain subject change.

    Distance to ISS Critical events
    *S-1/2(39 km behind and 5 km below)

    - ATV in waiting mode for final go ahead

    S0(30 km behind and 5 km below)

    Pre-homing

    S1 (15.5 km behind and 5 km below)
    S1 planned GO
    13:17 CEST

    - Homing starts

    S2(3.5 km behind and 100 m above)
    S2 arrival
    14:04 CEST
    S2 depart
    14:36 CEST

    - Station keeping point. External lights are activated. Russian Kurs radar-based system is activated and the ISS crew can begin using this data. Closing begins using relative GPS.

    500 m

    Video system of Zvezda turned on for ISS crew to view ATV on the Simvol screen.

    S3(249 m behind)
    S3 arrival 15:16 CEST
    S3 depart 15:52 CEST

    - Station keeping point. The Videometer and Telegoniometer (laser-pulsed instruments that calculate the distance and orientation to the ISS) are activated. Videometer is used as the prime sensor for GNC navigation. Go for Final Approach 1.
    Speed of ATV slows down from about 40 cm per second to 7 cm per second

    S4(19 m behind)
    S4 arrival 16:13 CEST
    S4 depart 16:29 CEST

    - Station keeping point. Close range videometer navigation is used. Pointing manoeuvre towards the Docking Port axis. Go for Final Approach 2.

    S41 (11 m behind)
    S41 arrival 16:31 CEST
    S41 depart 16:37 CEST

    - Station keeping point. Go to continue the Final Approach 2.

    Capture 16:40 CEST
    Hooks closed 17:14 CEST

    ATV docks to Zvezda

    ATV permanently connected to Zvezda

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    29
    Tweet
    • Automated Transfer Vehicle (ATV)
    • ESA's ATV blog direct from ATV mission control
      ESA's ATV blog direct from ATV mission control
      ATV Blog
    • Related articles
      • Jules Verne ATV given ‘go’ for docking
        • Impressive dress-rehearsal for Jules Verne ATV
          • Jules Verne ATV Demonstration Day 2 sequence of events
            • Jules Verne demonstrates key capabilities
              • Jules Verne demonstrates flawless Collision Avoidance Manoeuvre
                • Jules Verne ready to demonstrate critical manoeuvre
                  • Successful manoeuvres position Jules Verne ATV for crucial tests
                    • Europe launches its first resupply ship to the ISS
                      • Replay of launch and solar array opening of Jules Verne ATV
                      • Related links
                        • International Space Station
                          • Operations
                          • Related ESApod
                            • ATV: Closing in on the target
                              • ATV orbital rehearsals for ISS docking
                                • ATV: A new generation space vehicle
                                  • ATV: Rendezvous in space
                                    • ATV Control Centre readies for Europe's first-ever automated docking

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · Rare merger reveals secrets of gal…
    • · Watching for hazards: ESA opens as…
    • · ESA astronaut Timothy Peake set fo…
    • · Space drives e-mobility
    • · Proba-V opens its eyes
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions