• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

      • Media
      • ESA TV
      • Videos for professionals
      • Photos
    • For Educators

    • For Kids

    • ESA

    • Human Spaceflight

    • ATV

    • Flight plan
    • ATV mission concept
    • ATV flight phases
    • ATV cargo capacity
    • Spacecraft
    • ATV configuration
    • ATV Integrated Cargo Carrier
    • ATV Service Module
    • ATV evolution
    • ATV Missions
    • ATV-1: Jules Verne
    • ATV-2: Johannes Kepler
    • ATV-3: Edoardo Amaldi
    • ATV-4: Albert Einstein
    • ATV-5: George Lemaître
    • Operations
    • Flight operations
    • ATV Control Centre
    • Crew role
    • Industry
    • ATV history
    • European industry
    • ATV-4 downloads

      • ATV-4 mission brochure English
      • ATV-4 mission brochure German
      • ATV-4 mission brochure French
      • ATV-4 mission brochure Italian
      • ATV-4 mission brochure Russian
    • ATV multimedia
    • ATV image gallery
    • ATV video gallery
    • ATV on Flickr

    ESA > Our Activities > Human Spaceflight > ATV

    Jules Verne on track for long journey to ISS

    Jules Verne ATV performed the first orbital manoeuvres to set up phasing with ISS
    11 March 2008

    Following an overnight recovery operation, Jules Verne ATV's propulsion system has successfully been restored to full robustness. The spacecraft has since performed the first orbital manoeuvres necessary to set up phasing with the International Space Station.

    Flight control and engineering support teams analysed the data coming from the Automated Transfer Vehicle's on board computers which, after activation of the propulsion system following Sunday's launch, had detected a significant difference in pressure between the oxidiser and the fuel that compose the propellant and had disabled part of the propulsion system. A course of action was implemented overnight to resume the nominal mission.

    In a complex operation, commands to re-integrate an electronics box which drives that part of the propulsion system were up-linked to the spacecraft from within the ATV Control Centre in Toulouse, France. After the entire propulsion system was disabled, all four propulsion chains were progressively enabled, thereby restoring full failure tolerance.

    Liftoff of the Ariane 5 ES-ATV launcher
    Jules Verne ATV liftoff from Kourou, French Guiana

    Jules Verne ATV successfully performed a series of orbital manoeuvres earlier this afternoon. The two manoeuvres using the main engines, which occurred at 15:54 CET (14:54 UT) and 17:06 CET (16:06 UT), initiated the orbital phasing. Two additional orbit manoeuvres tomorrow afternoon will complete the phasing boost.

    Mission controllers in Toulouse are now rescheduling activities to take Jules Verne ATV to its parking orbit in front of the ISS, including a demonstration of the spacecraft's Collision Avoidance Manoeuvre capability. Once in the parking orbit, Jules Verne ATV will wait for the completion of the STS-123 Shuttle mission at the Space Station, before proceeding with the rendezvous demonstration manoeuvres and the final rendezvous and docking.

    Jules Verne ATV remains on schedule for docking with the ISS on 3 April.


    Animation illustrating the mission scenario for ATV
    Animation illustrating the mission scenario for Europe's Automated Transfer Vehicle

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    92
    Tweet
    • Automated Transfer Vehicle (ATV)
    • ESA's ATV blog direct from ATV mission control
      ESA's ATV blog direct from ATV mission control
      ATV Blog
    • Related articles
      • Jules Verne ATV under control after a textbook launch
        • Europe launches its first resupply ship to the ISS
          • Replay of launch and solar array opening of Jules Verne ATV
            • A dedicated Ariane 5 to launch Jules Verne
              • Jules Verne ATV atop launcher
              • Related links
                • International Space Station
                  • Operations
                  • Related ESApod
                    • ATV: A new generation space vehicle
                      • ATV: Rendezvous in space
                        • ATV Control Centre readies for Europe's first-ever automated docking

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · Earth Explorers take centre stage …
    • · The fast winds of Venus are gettin…
    • · ExoMars 2016 set to complete const…
    • · Herschel ends operations as orbiti…
    • · Europe’s largest spaceship reache…
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions