• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

      • Media
      • ESA TV
      • Videos for professionals
      • Photos
    • For Educators

    • For Kids

    • ESA

    • ATV

    • International Space Station

    • Human Spaceflight

    • Flight plan
    • ATV mission concept
    • ATV flight phases
    • ATV cargo capacity
    • Spacecraft
    • ATV configuration
    • ATV Integrated Cargo Carrier
    • ATV Service Module
    • ATV evolution
    • ATV Missions
    • ATV-1: Jules Verne
    • ATV-2: Johannes Kepler
    • ATV-3: Edoardo Amaldi
    • ATV-4: Albert Einstein
    • ATV-5: George Lemaître
    • Operations
    • Flight operations
    • ATV Control Centre
    • Crew role
    • Industry
    • ESA's role
    • European industry
    • ATV-4 downloads

      • ATV-4 mission brochure English
      • ATV-4 mission brochure German
      • ATV-4 mission brochure French
      • ATV-4 mission brochure Italian
      • ATV-4 mission brochure Russian
    • Multimedia gallery
    • ATV image gallery
    • ATV video gallery
    • ATV on Flickr

    ESA > Our Activities > Human Spaceflight > ATV

    Successful review for Jules Verne ATV launcher

    The Automated Transfer Vehicle is the first fully automatic re-supply spacecraft of its kind
    7 March 2008

    The Launch Readiness Review (RAL), organised by Arianespace at Europe’s Spaceport in Kourou, French Guiana, last night gave the go-ahead for today’s transfer of Ariane 5 out to the launch pad.

    About 80 people from Arianespace, Astrium, ESA and CNES participated in the 9-hour meeting in Kourou. Some 50 other experts joined by teleconference from Arianespace’s Headquarters in Evry-Courcouronnes, near Paris, France.

    “This RAL review is quite an exhaustive and transparent process where all the specialists and managers give an account of all their actions; it is very healthy and reassuring for ESA and especially the ATV team. We are very pleased with all the efforts and incredible work done by Arianespace and CNES in Kourou”, said Daniel Sacotte, ESA Director of Human Spaceflight, Microgravity and Exploration Programmes.

    Roll-out of the 760-tonne launcher and Jules Verne ATV from the Final Assembly Building at Europe’s Spaceport to the launch complex 3 (ELA 3) is scheduled for today (Friday 7 March) at 10:35 local time in Kourou (14:35 CET, 13:45 UT).

    Artist's impression of ESA's ATV on the launch pad
    Today's tranfer to the launch pad starts at 10:35 Kourou time

    Two days ago, ESA conducted a final pre-launch assessment to certify that the Jules Verne spacecraft, integrated to the launcher, was ready to proceed into final countdown.

    The launch of the 19-tonne Jules Verne ATV requires a special adaptation of Ariane 5 ES to launch the first ATV into low-Earth orbit. Ariane 5 ES qualification was completed at the end January 2008, including a re-ignition test of the upper EPS stage demonstrated in orbit in autumn 2007. This special qualification also required the strengthening of the upper stage to accommodate the 'heavy' ATV which is more than twice as heavy than any previous Ariane 5 payload.

    Jules Verne ATV was put through a 7.5-month launch campaign at the Spaceport in Kourou, including 3.5 weeks of combined operations of Ariane 5 and ATV.


    The Ariane 5 ES lift-off for this inaugural ATV flight is scheduled during the night of 8 to 9 March 2008 at the following time:
    05:03 CET on 9 March 2008
    04:03 UT on 9 March 2008
    01:03 Kourou time 9 March 2008

    Rendezvous and docking of ATV with the ISS is scheduled for 3 April.

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    39
    Tweet
    • Automated Transfer Vehicle (ATV)
    • ESA's ATV blog direct from ATV mission control
      ESA's ATV blog direct from ATV mission control
      ATV Blog
    • Related articles
      • Europe launches its first resupply ship to the ISS
        • Replay of launch and solar array opening of Jules Verne ATV
          • A dedicated Ariane 5 to launch Jules Verne
            • Jules Verne ATV atop launcher
            • Related links
              • International Space Station
                • Europe's Spaceport
                • Launchers
                  • Ariane 5 ES
                  • Related ESApod
                    • ATV: A new generation space vehicle
                      • ATV: Rendezvous in space
                        • ATV Control Centre readies for Europe's first-ever automated docking

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · Rare merger reveals secrets of gal…
    • · Watching for hazards: ESA opens as…
    • · ESA astronaut Timothy Peake set fo…
    • · Space drives e-mobility
    • · Proba-V opens its eyes
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions