• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

      • Media
      • ESA TV
      • Videos for professionals
      • Photos
    • For Educators

    • For Kids

    • ESA

    • Astrolab Mission

    • Human Spaceflight

    • Astronauts

    • International Space Station

    • Astrolab Mission
    • About the mission
    • Why Astrolab?
    • Mission facts
    • Information kit (pdf)
    • Astrolab weekly reports
    • Science programme
    • Human physiology
    • Biology
    • Radiation
    • Physics
    • Technology
    • Education
    • Meet the crew
    • Léopold Eyharts
    • Thomas Reiter
    • Michael E. Lopez-Alegria
    • Mikhail Tyurin
    • Expedition 13
    • Astrolab Mission live
    • Reiter EVA blog
    • Multimedia
    • Astrolab images
    • Astrolab videos

    ESA > Our Activities > Human Spaceflight > Astrolab

    STS-121 packing up ahead of journey home

    Leonardo returned to payload bay
    Leonardo is returned to Discovery's payload bay
    14 July 2006

    The Shuttle crew is packing up ahead of their scheduled departure from the International Space Station on Saturday. STS-121 astronauts Lisa Nowak and Stephanie Wilson have used Canadarm 2 to re-berth the Leonardo logistics module into Discovery's payload bay.

    ESA astronaut Thomas Reiter, Expedition 13 Flight Engineer 2, spent most of the morning preparing the multi-purpose logistics module (MPLM) for hatch closure.

    Packed with just over two tonnes of cargo including used equipment - items no longer needed in orbit on the Space Station - and a small amount of rubbish, Leonardo will return to Earth together with the STS-121 crew.

    The MPLM acts as a moving van for the International Space Station, ferrying scientific experiments and crew supplies to and from the orbiting laboratory. Leonardo, built by the Italian Space Agency, is the first of three such pressurised modules.

    The Leonardo logistics module was carried to the Station inside Space Shuttle Discovery's payload bay. Amongst the cargo delivered to the Station were three European-built experiment facilities; the Minus Eighty (Degrees) Laboratory Freezer (MELFI), the Percutaneous Electrical Muscle Stimulator (PEMS) and the European Modular Cultivation System (EMCS).

    Space Shuttle Discovery is due to undock from ISS at 10:08 CEST on Saturday 15 July and begin its two-day journey home. The first opportunity for landing at Kennedy Space Center, in Florida, is scheduled for 15:14 CEST on Monday 17 July.

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    1
    Tweet

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · Rare merger reveals secrets of gal…
    • · Watching for hazards: ESA opens as…
    • · ESA astronaut Timothy Peake set fo…
    • · Space drives e-mobility
    • · Proba-V opens its eyes
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions