• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

      • Media
      • ESA TV
      • Videos for professionals
      • Photos
    • For Educators

    • For Kids

    • ESA

    • Esperia Mission

    • Human Spaceflight

    • Astronauts

    • International Space Station

    • Esperia Mission
    • About the mission
    • Why Esperia?
    • Daily activities
    • Mission facts
    • Node 2
    • About Node 2
    • Meet the crew
    • Paolo Nespoli
    • Pamela Melroy
    • George Zamka
    • Scott Parazynski
    • Douglas Wheelock
    • Stephanie Wilson
    • Clayton Anderson
    • Expedition 16
    • Downloads
    • Factsheets (pdf)
    • Newspaper (pdf)
    • Esperia Mission live
    • ESA Television
    • NASA TV web streaming
    • Multimedia
    • Esperia gallery
    • Node 2 gallery
    • Services

    ESA > Our Activities > Human Spaceflight > Esperia

    The STS-120 crew during training with the M-113 armoured personel carrier at KSC

    STS-120 crew in practice countdown

    11 October 2007

    ESA astronaut Paolo Nespoli and his fellow STS-120 crewmembers have taken part in a practice countdown at NASA's Kennedy Space Center, in Florida, ahead of their mission to the International Space Station due for launch later this month.

    The practice countdown, or Terminal Countdown Demonstration Test (TCDT), is considered a key training exercise for the astronauts and for the Kennedy Space Center (KSC) launch team. The exercise gives engineers an opportunity to run through the preparations leading up to a Shuttle launch. It also serves as a launch-day dress rehearsal for the astronauts.

    As part of the training at KSC the crew are familiarised with the M-113 armoured personel carrier which is used to evacuate the crew from the launch pad in the case of fire. Later in the TCDT the crew donned their orange partial-pressure suits and entered Space Shuttle Discovery for a simulation of the launch countdown.

    As well as exchanging a member of the Station's permanent crew, and the challenging operation of repositioning a set of solar arrays, the STS-120 crew is responsible for the safe delivery of the Italian-built Node 2 connecting module - an important step in the continued construction of the International Space Station.

    The arrival of the cylindrical Node 2 module, which will be attached to the end of US Destiny laboratory, paves the way for the addition of the European Columbus laboratory and the Japanese Kibo laboratory.

    STS-120 is scheduled for launch on 23 October 2007.

    The STS-120 crew during training with the M-113 armoured personel carrier at KSC

    ESA astronaut Paolo Nespoli drives M-113 armoured personel carrier at KSC
    STS-120 crew answers press questions during the Terminal Countdown Demonstration Test at NASA's Kennedy Space Center, Florida
    STS-120 crew meet members of the press during Terminal Countdown Demonstration Test at KSC
    ESA astronaut Paolo Nespoli answers press questions during Terminal Countdown Demonstration Test at KSC
    The STS-120 crew walks out to board a bus that will transport them to the launch pad for a simulated countdown
    ESA astronaut Paolo Nespoli during the practice countdown for Space Shuttle flight STS-120
    The STS-120 crew boards a bus that will transport them to the launch pad

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    69
    Tweet
    • Related articles
      • Discovery moved to launch pad
        • Nespoli focuses on complex mission
        • Related links
          • Paolo Nespoli
            • Node 2: Connecting Module
            • Italian Space Agency (ASI)
            • STS-120 (NASA)
            • Downloads
            • Esperia factsheets (pdf)
            • Esperia newspaper (pdf)
            • Esperia gallery
            • Created by Italdesign SpA on a sponsorship agreement with ASI
              Created by Italdesign SpA on a sponsorship agreement with ASI
              Esperia Mission

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · The fast winds of Venus are gettin…
    • · ExoMars 2016 set to complete const…
    • · Herschel ends operations as orbiti…
    • · Europe’s largest spaceship reache…
    • · ATV ready to nose up to Station
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions