• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • Human Spaceflight

    • Astronauts

    • International Space Station

    • Research

    • Education

    • About the International Space Station
    • Pushing the boundaries of science and technology
    • Current status
    • Where is the International Space Station?
    • Building the International Space Station
    • International collaboration
    • International Space Station legal framework
    • Europe's partners
    • European participation
    • Space Station elements
    • Control centres
    • How much does it cost?

    ESA > Our Activities > Human Spaceflight > International Space Station

    Jules Verne passes acoustic test

    Jules Verne is moved into the acoustic test facility, LEAF
    3 July 2006

    Acoustic testing of Jules Verne, the first Automated Transfer Vehicle (ATV), has successfully been completed at ESA's test facilities in Noordwijk, The Netherlands.

    The 11-tonne test configuration of the ATV Flight Model (the actual flight launch mass is 20.5 tonnes) was transferred to the Large European Acoustic Facility (LEAF) with the help of an air cushion transfer pad.

    The ATV, an unmanned vehicle that will deliver supplies to the International Space Station (ISS), will be put into orbit by the European Ariane-5 launcher. Acoustic testing is vital to ensure the ATV can withstand the vibrations caused by the extreme noise levels generated during launch.

    Acoustic vibrations are been used to simulate the stress the ATV will encounter during the first three minutes of launch - due to aero dynamical forces - on top of the powerful European Ariane-5 launcher.

    Automated Transfer Vehicle
    Sensors attatched to ATV monitored hardware during test runs

    The whole structure of the ATV, which is the size of a double-decker London bus, will have to withstand an overall sound pressure level of 144 dB with main frequencies between 25Hz and 5kHz. The same amount of acoustic vibrations would be lethal for the human body.

    Over several days different test runs were conducted in the special enclosed facility, LEAF. Dozens of sensors placed in different areas of the ATV have measured and checked its hardware behaviour. Two-dozen technicians and engineers from Prime Contractor EADS Launch Vehicles, EADS Space Transportation, Alcatel Alenia Space (former Alenia Spazio), Dutch Space (acquired by EADS Space), European Test Services (ETS) and ESA coordinated the test runs.

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    38
    Tweet
    • Related articles
      • Successful downlink communication test for ATV from ISS
        • 2006: a challenging year for Jules Verne
        • Related links
        • Automated Transfer Vehicle (ATV)
        • About ESTEC Test Centre
        • Related ESApod
        • ATV passes acoutic test

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · Proba-V opens its eyes
    • · First new Galileo satellite arrive…
    • · Next destination: space
    • · Leak repaired on International Spa…
    • · After Chelyabinsk: European expert…
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions