• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • Lunar Lander

    • Human Spaceflight and Exploration

    • About Lunar Lander
    • Europe’s first Lunar Lander
    • Next-generation landing technology
    • Science on the Moon
    • Lunar Lander flight phases
    • Exploring the lunar South Pole
    • Lander configuration
    • Lunar Lander on the surface
    • Multimedia
    • Lunar Lander gallery

    ESA > Our Activities > Human Spaceflight > Lunar Lander

    Lunar lander firing up for touchdown

    Engine testing
    5 March 2012

    Europe’s ambition of touching down at the Moon’s south pole by 2018 has been boosted by recent test firings of the craft’s thrusters. The robot lander will prove new techniques for sending humans to the Moon and assess lunar hazards.

    With no atmosphere on the Moon, Lunar Lander cannot rely on parachutes to slow its descent. Instead, the craft will need to fire its engines in a rather unconventional way.

    One of these thrusters was recently put through its paces at Astrium’s specialised facility in Lampoldshausen, Germany.

    The test chamber was configured to reproduce the vacuum and temperatures that Lunar Lander will face on its way down to the Moon’s surface.

    Lunar Lander
    Lunar Lander

    A complete descent and touchdown was simulated, with the thruster firing in a series of short bursts, reaching a white-hot 1100ºC.

    According to ESA’s Bérengère Houdou, the results are positive: “The thruster operations were smooth and stable, with great performance, even under the stress of Lunar Lander’s operating conditions.”


    Lunar Lander engine
    Thruster

    To save the cost of developing a new engine, ESA engineers looked to the tried-and-tested thrusters of Europe’s proven Automated Transfer Vehicle (ATV) space ferry.

    ATV has already completed two fully automated missions to the International Space Station, delivering supplies and boosting the complex to a higher orbit.

    The third ATV is set for launch this month.

    But landing on the Moon is very different from docking with a space station. Before these tests, it was unclear whether the thrusters would be suitable for a lunar voyage.

    Ahead of landing, the craft will orbit the Moon some 100 km above the surface. To descend to the Moon’s southern pole, central engines will fire for 10 minutes as the ATV thrusters steer the spacecraft to a safe landing.

    There is no GPS for the Moon, so Lunar Lander will navigate by digitally imaging the surface and recognising features.

    A laser will complete the picture to avoid hazards such as boulders and craters at the target site.

    Lunar Lander’s powerful processor will make intelligent decisions to search for a safe area and touch down without human help. European technology will be used throughout.

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    44
    facebook
    twitter
    reddit
    google plus
    digg
    tumbler
    digg
    blogger
    myspace
    • Related articles
      • Next step for ESA’s first Moon lander
        • Fly us to the Moon…south pole to be precise
        • Related links
        • Automated Transfer Vehicle
        • Follow the ATV Johannes Kepler misison via ESA's ATV blog
          Follow the ATV Johannes Kepler misison via ESA's ATV blog
          ATV blog
        • Video on the lunar lander programme

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · CryoSat hits land
    • · Ariane 5 completes seven launches …
    • · Measuring skull pressure without t…
    • · Malargüe station inauguration
    • · The solar wind is swirly
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions