• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG’s blog
      • For Member State Delegations
      • Business with ESA
      • Law at ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
      • ESAshop
    • Our Activities

      • Space News
      • Observing the Earth
      • Human and Robotic Exploration
      • Space Transportation
      • Navigation
      • Space Science
      • Space Engineering & Technology
      • Operations
      • Telecommunications & Integrated Applications
      • Preparing for the Future
    • Careers at ESA

    • For Media

      • Media
      • ESA TV
      • Videos for professionals
      • Photos
    • For Educators

    • For Kids

    • ESA

    • Human Spaceflight

    • ATV

    • Flight plan
    • ATV mission concept
    • ATV flight phases
    • ATV cargo capacity
    • Spacecraft
    • ATV configuration
    • ATV Integrated Cargo Carrier
    • ATV Service Module
    • ATV evolution
    • ATV Missions
    • ATV-1: Jules Verne
    • ATV-2: Johannes Kepler
    • ATV-3: Edoardo Amaldi
    • ATV-4: Albert Einstein
    • ATV-5: Georges Lemaître
    • Operations
    • Flight operations
    • ATV Control Centre
    • Crew role
    • Industry
    • ATV history
    • European industry
    • ATV multimedia
    • ATV image gallery
    • ATV video gallery
    • ATV on Flickr

    ESA > Our Activities > Human and Robotic Exploration > ATV

    Space Station crew enters Jules Verne ATV

    Jules Verne ATV docked with ISS on 3 April 2008
    5 April 2008

    The astronauts on board the International Space Station performed final ATV hatch opening at around 10:30 CEST (08:30 UT) this morning, clearing the way for the crew to start unloading Jules Verne’s cargo delivery.

    The hatches between ISS and Jules Verne ATV were opened for the first time at around 12:15 CEST (10:15 UT) on Friday, at which time the crew briefly entered ATV to place an air filtering device. The so-called ‘air scrubber’ was left to run for 8 hours removing any unwanted gasses or small particles of debris that may be floating around.

    Immediately after hatch reopening this morning, the lights inside Jules Verne ATV were turned on and the air scrubber dismounted. The crew will now install portable breathing apparatus, a fire extinguisher and the handrails which help the astronauts move around inside ATV. A flexible hose will also be installed to provide additional ventilation. Once all of these items are in place, ATV is ready for full, regular operations

    Loading dry cargo into Jules Verne
    Jules Verne's dry cargo was loaded in December

    "Everyone here is really pleased with how operations have gone so far, both in space and on the ground. It's a great moment to watch the astronauts going in to ATV - everyone here is happy. Now we will continue to monitor progress," said Alberto Novelli, ESAs head of operations at ATV Control Centre in Toulouse, France

    Over the next weeks the crew will remove the 1150 kg of dry cargo delivered by Jules Verne – including fuel, clothes, equipment as well as two original manuscripts handwritten by Jules Verne and a XIXth century illustrated edition of his novel ‘From the Earth to the Moon’. In addition the crew will pump 856 kg of propellant, 270 kg of drinking water and 21 kg of oxygen into Zvezda’s tanks.


    Removing an adapter plate during ATV training
    Expedition 16 crew trained for hatch opening and ingress at EAC

    ATV also brings a special gift – a playlist of music selected by Norwegian teenager Therese Miljeteig, the winner of ESA’s ATV competition to suggest 10 songs to inspire the astronauts.

    Jules Verne will remain attached to as a 48 m3 pressurised and integral part of the complex until early August. When required, ATV will boost the Station’s orbit to overcome the effects of residual atmospheric drag. At the end of its mission, Jules Verne ATV will burn up in a controlled reentry into the Earth’s atmosphere, and in the process, it will eliminate 6.3 tonnes of waste material no longer needed on the Station and stored over 4 months in the ATV.

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    964
    Tweet
    • Automated Transfer Vehicle (ATV)
    • ESA's ATV blog direct from ATV mission control
      ESA's ATV blog direct from ATV mission control
      ATV Blog
    • Related articles
      • Crew opens hatch to Jules Verne ATV
        • Europe’s automated ship docks to the ISS
          • Jules Verne ATV docking video replay
            • Jules Verne ATV given ‘go’ for docking
              • Impressive dress-rehearsal for Jules Verne ATV
                • Jules Verne demonstrates key capabilities
                  • Europe launches its first resupply ship to the ISS
                    • Replay of launch and solar array opening of Jules Verne ATV
                    • Related links
                      • International Space Station
                        • Operations
                        • Related ESApod
                          • ATV: Closing in on the target
                            • ATV orbital rehearsals for ISS docking
                              • ATV: A new generation space vehicle
                                • ATV: Rendezvous in space
                                  • ATV Control Centre readies for Europe's first-ever automated docking
    • App Store
    • Subscribe
    • mobile version
    • FAQ

    • Site Map

    • Contacts

    • Terms and conditions