• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

      • Media
      • ESA TV
      • Videos for professionals
      • Photos
    • For Educators

    • For Kids

    • ESA

    • Home

    • Launch vehicles

    • Europe's Spaceport

    • New Technologies

    • Strategy for launchers
    • Launcher strategy
    • Future Launchers Preparatory Programme
    • International cooperation
    • Launchers and industry
    • Launcher history
    • A look at the past
    • Ariane 1, 2, 3
    • Ariane 4
    • Launches
    • Previous launches
    • Launch schedule
    • Multimedia
    • Image gallery
    • Video gallery
    • RSS feeds
    • Flyers
    • Vega - Europe's small launcher
    • Soyuz - Europe's launch site for Soyuz
    • IXV - Intermediate Experimental Vehicle
    • NGL - Europe's Next-Generation Launcher
    • Launchers on your desktop
    • Screensavers and wallpaper
    • Services
    • Glossary
    • Frequently asked questions
    • Comments

    ESA > Our Activities > Launchers

    Ariane 5’s fourth launch of 2011

    Ariane 5 flight VA203
    7 August 2011

    Early this morning, an Ariane 5 launcher lifted off from Europe’s Spaceport in French Guiana on its mission to place two telecommunications satellites, Astra-1N and BSAT-3c/JCSAT-110R, into their planned transfer orbits.

    The target injection orbit had a perigee altitude of 249.6 km, an apogee altitude at injection of 35 959 km and an inclination of 2º.

    The satellites were accurately injected into their transfer orbits about 27 minutes and 38 minutes after liftoff, respectively.

    Astra-1N will be positioned above the equator at 19.2°E. It will provide direct-to-home television broadcast services in Europe.

    BSAT-3c/JCSAT-110R, to be positioned over 110°E, will provide mainly television broadcast services in Japan.

    The payload mass for this launch was 9095 kg; the satellites totalled 8240 kg, with payload adapters and dispensers making up the additional 855 kg.

    Ariane 5 flight VA203

    VA203 flight timeline

    The Ariane 5’s cryogenic, liquid-propellant main engine was ignited first. Seven seconds later, the solid-propellant boosters also fired, and the vehicle lifted off a fraction of a second later.

    The solid boosters were jettisoned 2 min 21 sec after main engine ignition, and the fairing protecting the payload during the climb through Earth’s atmosphere was discarded at 3 min 12 sec.

    The launcher’s main engine was shut down at 8 min 52 sec; six seconds later, the main cryogenic stage separated from the upper stage and its payload.

    Four seconds after main stage separation, the engine of the cryogenic upper stage was ignited to continue the journey. The engine was shut down at 24 min 58 sec into the flight, at which point the vehicle was travelling at 9356 m/s (33 682 km/h) at an altitude of 657 km. The conditions for geostationary transfer orbit injection had been achieved.

    At 27 min 12 sec after main engine ignition, Astra-1N separated from the upper stage, followed by BSAT-3c/JCSAT-110R at 38 min 11 sec. Ariane 5’s flight operations were completed 49 min 41 sec after main engine ignition.

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    73
    Tweet
    • Related news
      • Ariane 5’s third launch of 2011
        • Ariane 5’s second launch of 2011
          • Europe’s ATV Johannes Kepler supply ship on its way to Space Station
            • Ariane 5’s sixth launch of 2010
              • Hylas-1 in orbit brings Europe broadband from space
              • Visit Kourou
              • Countdown
              • Build a launcher
              • Ariane 5
              • Vega
              • Soyuz
              • External links
              • Arianespace

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · The fast winds of Venus are gettin…
    • · ExoMars 2016 set to complete const…
    • · Herschel ends operations as orbiti…
    • · Europe’s largest spaceship reache…
    • · ATV ready to nose up to Station
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions