• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

      • Media
      • ESA TV
      • Videos for professionals
      • Photos
    • For Educators

    • For Kids

    • ESA

    • Home

    • Launch vehicles

    • Europe's Spaceport

    • New Technologies

    • Europe's Spaceport
    • Overview of Europe's Spaceport
    • Ariane launch campaign
    • About French Guiana
    • Attend a launch
    • Who's who at Kourou
    • ESA at Europe’s Spaceport
    • CNES at Europe's Spaceport
    • Arianespace at Europe's Spaceport
    • European industry at the Spaceport
    • Launches
    • Launch schedule
    • Launch update
    • Multimedia
    • Image gallery
    • Video gallery
    • RSS feeds
    • Services

    ESA > Our Activities > Launchers > Europe's Spaceport

    Satellite preparation campaign

    Rosetta at Europe's Spaceport

    Satellite(s) that have booked a ride on an Ariane 5 arrive by plane at Rochambeau Airport in Cayenne, French Guiana. The containers holding the satellite(s) and all the necessary equipment are then transferred by road to the Satellite Preparation Facilities at the Spaceport.

    The typical operations needed to prepare a satellite for launch are, chronologically:

    • installation of satellite check-out consoles and ground mechanical equipment
    • placing of the satellite in a clean zone
    • integration of separately shipped elements
    • fitting the payload adaptor
    • electrical and optical validation tests
    • preparation of satellite for propellant filling
    • filling with liquid propellant using specific equipment
    • final pressurisation and checks to ensure that no leakages can occur
    • final preparation of satellite prior to transfer to the Final Assembly Building

     

    Once all the tests have been completed the satellite is transferred to the Final Assembly Building where it is fitted on top of the launcher.

    Last update: 30 October 2012

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    61
    Tweet
    • Launch campaign
      • Launcher campaign
        • Satellite preparation campaign
          • Spaceport preparation campaign
          • Videos
          • Watch a launch countdown
            WindowsMedia (1.4 MB)
          • Watch a launch countdown Quick Time (3.1 MB)

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · Rare merger reveals secrets of gal…
    • · Watching for hazards: ESA opens as…
    • · ESA astronaut Timothy Peake set fo…
    • · Space drives e-mobility
    • · Proba-V opens its eyes
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions