• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • Home

    • Launch vehicles

    • Europe's Spaceport

    • New Technologies

    • Strategy for launchers
    • Launcher strategy
    • Future Launchers Preparatory Programme
    • International cooperation
    • Launchers and industry
    • Launcher history
    • A look at the past
    • Ariane 1, 2, 3
    • Ariane 4
    • Launches
    • Previous launches
    • Launch schedule
    • Multimedia
    • Image gallery
    • Video gallery
    • RSS feeds
    • Flyers
    • Vega - Europe's small launcher
    • Soyuz - Europe's medium launcher
    • IXV - Intermediate Experimental Vehicle
    • NGL - Europe's Next-Generation Launcher
    • Launchers on your desktop
    • Screensavers and wallpaper
    • Services
    • Glossary
    • Frequently asked questions
    • Comments

    ESA > Our Activities > Launchers

    Rosetta launch delayed for technical reasons

    Missing piece of thermal insulation
    27 February 2004

    Today's launch of Flight 158 with the Rosetta spacecraft will be delayed by a few days to allow for a minor repair to the external thermal protection on Ariane 5’s core cryogenic stage.

    Arianespace reports that a visual inspection of the cryogenic core stage detected that a 10 X 15-cm piece of the protection was missing, giving reason for the countdown to be stopped. The inspection was made prior to the start of the stage’s fuelling. This thermal protection insulates the stage’s cold cryogenic propellants against the warmer external environment.

    To replace the missing piece of insulation, Ariane 5 will be moved on its mobile launch table back to the Spaceport’s Final Assembly Building, where a new block of thermal protection will be installed. Once the new piece is in place, the adhesive requires approximately 36 hours for its drying/curing process.

    Both the launcher and the Rosetta spacecraft remain in a 'safe' mode.

    Resumption of the Flight 158 countdown is planned for the beginning of next week.

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    45
    Tweet
    • More about...
      • Rosetta at a glance
      • Rosetta press kit
        • Rosetta's journey
        • Related articles
          • History of cometary missions
            • Why 'Rosetta'?
              • Comets - an introduction
                • Life of a comet
                  • How many comets are there?
                    • Where life began
                    • Related links
                    • ESA Science - Rosetta
                    • Arianespace
                    • Astrium
                    • DLR

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · ESA astronaut Timothy Peake set fo…
    • · Space drives e-mobility
    • · Proba-V opens its eyes
    • · First new Galileo satellite arrive…
    • · Next destination: space
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions