• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • Home

    • Navigation

    • Galileo

    • Multimedia
    • Galileo image gallery
    • Galileo video gallery
    • Brochures
    • GIOVE - First Galileo Satellites (.pdf, 1.2 Mb)
    • Die Ersten Gallileo Satelliten - Giove A & B (.pdf, 1.1 Mb)
    • Les Premiers Satellites Gallileo - Giove A & B (.pdf, 576 kb)
    • Galileo I Primi Satelliti - Giove A & B (.pdf, 1.1 Mb)
    • Services

    ESA > Our Activities > Navigation > The future - Galileo > GIOVE-B launch

    GIOVE-B under test; launcher integration under way

    28 March 2008

    GIOVE-B has been connected to its ground support equipment and the process of checking out the spacecraft following the journey to Baikonur has begun. The construction of the Soyuz FG launch vehicle is under way.

    GIOVE-B is in the Starsem Payload Preparation Facility at Baikonur Cosmodrome. The spacecraft has been connected to the support equipment that provides it with power and control signals and measures the performance of the various systems onboard. Rigorous testing will be performed before GIOVE-B is attached to the Fregat upper stage that will guide it into orbit.

    GIOVE-B

    While the spacecraft is being tested, its launch vehicle is being assembled. Air pressure testing of the launcher propulsion systems has been completed and the four first-stage boosters have been mated with the central core.


    GIOVE-B

    GIOVE-B is the second in-orbit validation spacecraft for Europe's Galileo global navigation satellite system. It is designed to test novel, key technologies for the Galileo network, including the triple-channel transmission of navigation signals.

    GIOVE-B

    The satellite carries a high-precision passive maser clock - the most accurate clock ever flown in space, and the spacecraft will be able to transmit MBOC (multiplexed binary offset carrier) signals in accordance with a recent interoperability agreement for Galileo and GPS.

    GIOVE-B

    GIOVE-B will have a liftoff mass of 530 kg. It was built by an industrial consortium headed by Astrium GmbH (Germany) as satellite prime, with Thales Alenia Space (Italy) as subcontractor for satellite assembly, integration and test.

    GIOVE-B

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    29
    Tweet
    • Related news
      • GIOVE-B in clean room at Baikonur Cosmodrome
        • GIOVE-B arrives at Baikonur Cosmodrome
          • GIOVE-B leaves ESTEC en-route to Baikonur
            • Second Galileo spacecraft prepares for launch
              • GIOVE-B arrives at ESTEC for final tests
              • Related links
              • Galileo website (European Commission)
              • European GNSS Supervisory Authority (GSA)

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · Proba-V opens its eyes
    • · First new Galileo satellite arrive…
    • · Next destination: space
    • · Leak repaired on International Spa…
    • · After Chelyabinsk: European expert…
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions