• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • GOCE

    • Earth Explorers

    • Observing the Earth

    • Living Planet

    • GOCE at a glance
    • The first of a series
    • Looking into the forces that shape our planet
    • A technological achievement
    • An intimate portrait of Earth
    • Facts and figures
    • About the spacecraft

      • Satellite
      • Payload
    • About the launch

      • Launch overview
      • Launcher
      • After launch
      • GOCE data
    • Meet the team

      • Danilo Muzi, Project Manager
      • Rune Floberghagen, Mission Manager
      • Reiner Rummel, Chairman Mission Advisory Group
      • Mark Drinkwater, Mission Scientist
      • Roger Haagmans, Mission Scientist
      • Andrea Allasio, Thales Alenia Space Project Manager
      • Michael Fehringer, System Manager
      • Paolo Laberinti, Head of Verification and Testing
      • Miguel Aguirre, Technical Officer for Definition Phase
      • Daniel Lamarre, Gradiometer Engineer
      • Juan Piñeiro, Spacecraft Operations Manager
      • Stefano Capitanio, Launch Campaign Manager
      • Pascal Gilles, Head of Earth Explorer Payload Data Ground Segment
    • Multimedia
    • Image gallery
    • Videos
    • Online resources

    ESA > Our Activities > Observing the Earth > GOCE

    minigallery: GOCE launch diary gallery

    Complementing the GOCE launch diary, this image gallery provides a glimpse into the range of activities that are being carried out to prepare the satellite for launch. The photos show the satellite being shipped from ESA's facilities in the Netherlands to the Plesetsk Cosmodrome in northern Russia, the campaign in the autumn of 2008 and activities gearing up for launch on 17 March 2009. The most recent pictures feature first.

    • 1
    • |2
    • |3
    • |4
    • |5
    • |6
    • |7
    • |8
    • |9
    • |10
    • |>
    •   >>
    Smiling faces: GOCE team from industry and ESA at end of LEOP
    GOCE Mission Control Team on final shift in Main Control Room 20 March 2009
    Deputy Flight Operations Director P. Ferri (L) & GOCE Mission Manager R. Floberghagen in Main Control Room
    Antonov returns GOCE support equipment back to NL
    Cleanroom used for storage
    GOCE liftoff
    GOCE liftoff
    GOCE launch team in Plesetsk
    GOCE launch team in Plesetsk
    Team members preparing for launch
    Team members preparing for launch
    • 1
    • |2
    • |3
    • |4
    • |5
    • |6
    • |7
    • |8
    • |9
    • |10
    • |>
    •   >>
    • Solar cell inspection
      Solar cell inspection
      Diary in pictures
    • GOCE launch diary
      • Entry 1: GOCE prepares for shipment to Russia
        • Entry 2: GOCE begins its journey to launch site
          • Entry 3: GOCE arrives safely at launch site in Russia
            • Entry 4: GOCE unpacked and alignment check complete
              • Entry 5: GOCE checked for gas leaks
                • Entry 6: Launch team reaches full strength
                  • Entry 7: Gradiometer checked and launcher rolled out for testing
                    • Entry 8: GOCE satellite joins Breeze
                      • Entry 9: Last-ever look at GOCE
                        • Entry 10: GOCE on the launch pad
                          • Entry 11: Launch of GOCE delayed
                            • Entry 12: Satellite activities resume 24 September
                              • Entry 13: GOCE team gearing up for new launch date
                                • Entry 14: GOCE launch postponed
                                  • Entry 15: March launch planned for GOCE
                                    • Entry 16: Team make ready to wake up GOCE
                                      • Entry 17: GOCE revealed as container opened
                                        • Entry 18: A busy week
                                          • Entry 19: GOCE meets launcher Upper Stage
                                            • Entry 20: Encapsulation
                                              • Entry 21: On the launch pad
                                                • Entry 22: Launch rehearsed
                                                  • Entry 23: GOCE launched and in orbit
                                                    • Entry 24: Going home
                                                    • In depth
                                                      • Plesetsk
                                                      • Related links
                                                      • Eurockot
                                                      • Thales Alenia Space

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · CryoSat hits land
    • · Ariane 5 completes seven launches …
    • · Measuring skull pressure without t…
    • · Malargüe station inauguration
    • · The solar wind is swirly
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions