• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • Observing the Earth

    • Living Planet

    • Earth Explorers

    • GOCE

    • ESA's gravity mission GOCE
    • Science

      • Science overview
      • Objectives
      • Focus areas

        • Ocean circulation
        • Solid-Earth physics
        • Geodesy
    • Mission

      • Mission overview
      • Milestones
      • Payload
      • Satellite
      • Ground segment
    • Data

      • Data overview
      • Calibration
      • Data products
    • Publications

      • Publications
    • Services
    • Subscribe
    • Contact us

    ESA > Our Activities > Observing the Earth > The Living Planet Programme > Earth Explorers > GOCE

    GOCE first global gravity model

    GOCE mission milestones

    November 2010
    GOCE granted 18-month extension

    29 September 2010
    GOCE resumes normal service

    6 September 2010
    GOCE recovers from telemetry glitch that had prevented the satellite from sending its scientific data to Earth for several weeks

    29 June 2010
    First global gravity model presented at ESA’s Living Planet Symposium

    September 2009
    GOCE in measurement mode

    17 March 2009
    GOCE launched at 15:21 CET!

    16 March 2009
    Launch operations stopped a few seconds before liftoff due to an anomaly in the launch tower. Launch rescheduled for 17 March 2009

    4 February 2009
    Planned launch date of 16 March 2009 announced

    24 October 2008
    Launch delayed until 2009

    16 October 2008
    Tentative 27 October launch date postponed to allow conclusion of technical equiry

    2 October 2008
    New tentative launch date of 27 October 2008 set

    8 September 2008
    GOCE launch delayed due to an anomaly in the guidance and navigation subsystem of the launcher's upper stage (Breeze KM ). Launch rescheduled for 5 October 2008

    1 September 2008
    GOCE encapsulated in the fairing of the Rockot launch vehicle

    1 August 2008
    GOCE arrives at Plesetsk Cosmodrome for start of launch campaign

    29 July 2008
    GOCE en route to Russia’s Plesetsk Cosmodrome

    May-June 2008
    GOCE satellite reconfigured for September launch

    May 2008
    New launch date set for GOCE: 10 September 2008

    March 2008
    GOCE media day at ESA/ESTEC

    August 2007
    GOCE arrives at ESA-ESTEC in the Netherlands for final testing

    March 2007
    Instruments integrated into gradiometer at Alcatel Alenia Space, Cannes, France

    February 2007
    GOCE Mission Advisory Group Meeting at Alcatel Alenia Space, Turin, Italy during integration and testing of GOCE Flight Model

    December 2006
    High-Level Processing Facility acceptance review successfully passed

    November 2006
    Third International GOCE User Workshop, at ESA-ESRIN, Frascati, Italy

    October 2006
    Announcement of Opportunity for the Exploitation of GOCE Data released

    September 2006
    GOCE platform delivered to Alcatel Alenia Space for final integration of flight model

    July 2006
    Payload Data Segment (PDS) and Instrument Processing Facility (IPF) acceptance in ESA-ESRIN, Frascati, Italy

    December 2005
    GOCE System level Critical Design Review (CDR) close-out meeting

    Testing of the Ion Propulsion Assembly (IPA) Engineering Qualification Model (EQM) at Qinetiq, UK

    Acceptance Review of the first complete version of the High-Level Processing Facility

    July 2005
    Part 1 of GOCE Satellite System level Critical Design Review completed
    Critical Design Review of High-level Processing Facility, and the Calibration and Monitoring Facility
    Payload Data Segment (PDS) Acceptance Review 1

    December 2004
    Version 0 Acceptance Review of HPF
    Calibration and Monitoring Facility (CMF) and Reference Planning Facility (RPF) System Requirements Review successfully concluded

    November 2004
    Ground Segment Design Review successfully completed

    October 2004
    Contract signed between ESA and the Institute for Astronomical and Physical Geodesy (IAPG) from the Technical University of Munich for GOCE data analysis and modelling

    October 2004
    GOCE High-Level (Level 1 – Level 2) Processing Facility (HPF) Contract signed

    March 2004
    Second International GOCE User Workshop at ESA-ESRIN, Frascati, Italy


    December 2003
    Issue of Request For Quotation (RFQ) for the implementation and operation of the Level 2 High Level Processing Facility to the European GOCE Gravity Consortium (EGG-C)
    Contract placed with Eurockot Launch Services GmbH for launch of GOCE spacecraft

    September 2003
    Approval of proposals for Scientific pre-processing and External Calibration and Validation of GOCE L1b data products. One proposal approved for development of a Level 2 Data Processing Facility, from the European GOCE Gravity Consortium (EGG-C).

    May 2003
    Release the Announcement of Opportunity (AO) for scientific pre-processing, external calibration and validation of Level 1B GOCE data products

    February 2003
    Release of GOCE Level 1b Payload Data Segment ITT

    November 2002
    Completion of GOCE Ground Segment Requirements Review

    May 2002
    Release of GOCE Space Segment Phase C/D (construction and integration phases)

    April 2002
    Successful completion of the GOCE Space Segment Preliminary Design Review

    April 2001
    First International GOCE User Workshop at ESA-ESTEC, Noordwijk, Netherlands

    February 2001
    Full release of GOCE Space Segment Phase B Invitation to Tender (ITT) to Industry

    December 2000
    Start of Phase B with a preliminary authorisation

    November 1999
    Approval of GOCE by the Programme Board for Earth Observation

    October 1999
    "Granada II" Workshop with endorsement to select GOCE and ADM as first Earth Explorer Core Missions

    July 1999
    End of Phase A resulting in a comprehensive Report for Mission Selection

    July 1998
    Kick-off for feasibility study (Phase A)

    May 1996
    "Granada I" Workshop with recommendation to study the concept for a future gravity mission

    Last update: 3 March 2011

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    45
    facebook
    twitter
    reddit
    google plus
    digg
    tumbler
    digg
    blogger
    myspace
    • Related links
    • Thales Alenia Space
    • EADS Astrium
    • ONERA
    • Eurockot
    • GOCE first global gravity model
      GOCE first global gravity model
      Access GOCE data

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · CryoSat hits land
    • · Ariane 5 completes seven launches …
    • · Measuring skull pressure without t…
    • · Malargüe station inauguration
    • · The solar wind is swirly
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions