• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • Observing the Earth

    • Living Planet

    • Earth Explorers

    • SMOS

    • ESA's water mission SMOS
    • Science

      • Overview
      • Objectives
      • Focus areas
    • Mission

      • Overview
      • Payload
      • Satellite
      • Ground segment
    • Data

      • Overview
      • Validation
    • Publications

      • Publications
    • Services
    • Subscribe

    ESA > Our Activities > Observing the Earth > The Living Planet Programme > Earth Explorers > SMOS

    SMOS satellite joins launch adapter

    SMOS joining its launch adapter
    14 October 2009

    As preparations for the launch of SMOS on 2 November continue to progress well at the launch site in Russia, a milestone in the schedule has been passed as the satellite joins the Rockot launch adapter.

    ESA’s ‘Soil Moisture and Ocean Salinity’ (SMOS) satellite arrived at the Plesetsk Cosmodrome in northern Russia on 17 September. After it had been installed in the integration facilities and unpacked, the team of engineers and technicians carried out initial tests to ensure the satellite had arrived in good shape.

    SMOS separation from Breeze

    By employing a novel use of technology, the SMOS Earth Explorer mission will make global observations of soil moisture over land and sea-surface salinity over the oceans to improve our understanding of Earth’s water cycle. Data from SMOS will be important for weather and climate modelling, water resource management, agriculture and also contribute to the forecasting of hazardous events such as floods.

    The measuring technique involves measuring microwave radiation emitted from Earth’s surface within the ‘L-band’, around a frequency of 1.4 GHz. To do this, the instrument, which is called ‘MIRAS’ – short for Microwave Imaging Radiometer with Aperture Synthesis, carries 69 small antennas distributed along three arms that fold out to form an unusual three-pointed star shape. The clever bit is that these small antennas mimic the size of a much larger single antenna that would normally be needed at this frequency to obtain the required coverage and resolution.


    Closing the hydrazine drum after fuelling
    Closing the hydrazine drum after fuelling

    The campaign to prepare the SMOS satellite for launch has now been underway for almost four weeks. The satellite has undergone a series of electrical tests and also the hazardous task of filling the satellite with 28 kg of hydrazine fuel was carried out by team members from Thales Alenia Space. In addition, multilayer insulation has been secured around certain components on the satellite.

    The most recent milestone involved hoisting the satellite off the working stand on the fuelling frame and then lowering onto the launch adapter. As the name suggests, the adapter forms the interface between the SMOS satellite and the upper stage of the Rockot launcher. Since the satellite already holds fuel, this task is somewhat dangerous, so everyone involved had to wear special protective clothing as a precautionary measure.

    SMOS being hoisted onto launch adapter
    SMOS being hoisted from fuelling stand

    Once the satellite was positioned on the adapter, a clamp band, which is a crucial component that secures the satellite to the adapter, was fitted and tension then carefully applied. As ESA’s Proba-2 mission is being launched on the same rocket, there are, in fact, two of these clamp bands: one to hold the SMOS satellite on the adaptor and one to connect the two halves of the adapter, which separate after SMOS is released into orbit.

    The small Proba-2 satellite sits under the SMOS adapter during launch, so the release of the adapter halves enables the Proba-2 satellite to be injected into orbit. This happens almost two hours after SMOS has been injected.

    The Proba-2 team has also returned to Plesetsk as the launch campaign activities for both satellites are now being combined in the run up to liftoff at 02.50 CET on 2 November. The next major step will be when teams have to say ‘goodbye’ to the satellites as SMOS and Proba-2 are encapsulated together within the fairing, which is scheduled to take place on 19 October.

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    42
    Tweet
    • SMOS in orbit
      SMOS in orbit
      SMOS launch
    • Related news
      • SMOS launch nearing: Media Day at ESA/ESRIN
        • SMOS arrives safely at Russian launch site
          • SMOS team gears up for launch campaign
            • SMOS and Proba-2 launch rescheduled for November
            • In depth
              • SMOS
                • Proba Missions
                • Related links
                • Thales Alenia Space
                • EADS-CASA
                • CNES
                • Eurockot Launch Services
                • ESA on Youtube
                • Earth Explorers

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · ESA astronaut Timothy Peake set fo…
    • · Space drives e-mobility
    • · Proba-V opens its eyes
    • · First new Galileo satellite arrive…
    • · Next destination: space
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions