• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • Observing the Earth

    • Living Planet

    • Meteorological missions

    • MetOp

    • MetOp at a glance
    • Overview
    • Why we need MetOp
    • Facts & figures
    • History
    • Satellite

      • About the satellite
      • Payload Module
      • Service Module
    • Instruments

      • Overview
      • Technical summary
    • Launch

      • Launch sequence
      • Launcher
    • Mission operations

      • Operations
      • Orbit
    • Resources

      • Publications
      • General links
      • Glossary
      • Acronym list
    • Multimedia
    • MetOp images
    • MetOp videos
    • MetOp animations
    • Help
    • Services
    • Subscribe

    ESA > Our Activities > Observing the Earth > The Living Planet Programme > Meteorological missions > MetOp

    GOME-2 focal-plane assemblies

    GOME-2 has a total of six Focal Plane Assemblies (FPAs), four devoted to the main spectrometer channels and two to the new polarisation channels. The basic design for the four main-spectrometer FPAs is very similar to that for GOME-1, with titanium being used for the structure and a quartz window on the side where it is assembled on the spectrometer objective. Each FPA contains a random-access linear silicon photodiode array, consisting of 1024 elements each 2.5 x 0.025 mm2 (type Reticon RL 1024 SRU), which is reverse-biased and operates in charge accumulation mode.

    To achieve maximum sensitivity, the detector has to be cooled to -38°C by means of a thermoelectric cooler on the bottom face of the detector. To reject the heat generated by the cooler, a low-resistance thermal path to the main GOME-2 radiator is provided by two heat pipes, and some specially designed parts to absorb the effects of thermal expansion. The detector temperature is controlled in closed loop by a suitable electronic circuit inside the Control and Data Handling Unit; the actual target temperature can be programmed in-flight to any value between ambient and -38°C. Based on GOME-1 experience, stability is better than ± 0.1°C.

    To avoid ice formation during ground testing, each FPA has a vacuum-tight enclosure containing the detector and cooler. This enclosure can be evacuated via a system of pipes on the bottom of the optical bench and a tap on the back of the instrument, which will be removed just before launch, allowing the FPAs to evacuate naturally during the ascent phase.

    The FPA electronics is split onto two boards. The first carries the charge amplifier, made up of a dual-FET differential stage and a low-noise amplifier. To achieve maximum noise immunity, this board is installed on the rear of the vacuum enclosure, just 3 cm from the detector. The second board is mounted on top of the spectrometer objective, and contains some filtering circuits, the 16-bit A/D converter and the interfaces. Thanks to the modular approach, each FPA can be tested and trimmed at module level before final integration on the instrument. Testing has shown that, due to their careful design, the FPA electronics have low noise and a dynamic range of about 30 000.

    There are 255 integration times possible, ranging from 93.75 msec to more than 1 h. In channels 1 and 2, two different integration times can be selected for two bands of the detector; and the border between the two bands is in-flight programmable.

    The two Polarisation Unit FPAs are slightly different. Due to the less-demanding detection performance needs and the more stringent requirements on mechanical accommodation, no closed-loop thermal control has been implemented. Consequently, neither the thermal link to the radiator nor the vacuum-tight enclosure is present, with very beneficial effects in terms of mass savings and structural robustness. The detector is cooled anyway in open-loop configuration to about 0°C by a thermoelectric element, which rejects heat to the main optical bench through the PU mechanics. Although not stabilised, the detector temperature is kept low enough for the dark current effect to be neglected in this particular case. The detection electronics is the same as for main-channel FPAs. Integration time will normally be fixed at 23.4 msec, and the spectral information will be grouped in 12 fully programmable bands (300 – 790 nm). The integration time can be programmed as per the main-channel FPAs during calibration phases.

    Last update: 28 June 2006

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    16
    Tweet
    • In depth
    • About GOME-2
    • Description
    • Spectrometer
    • Polarisation
    • Calibration unit
    • Focal-plane assemblies
    • Scan unit
    • Control and data handling system
    • Performance
    • Products
    • Calibration/validation
    • Ground processor Prototype
    • Related articles
      • Monitoring ozone with GOME-2
      • MetOp's instruments
      • A/DCS
      • AMSU-A1
      • AMSU-A2
      • ASCAT
      • AVHRR
      • GOME-2
      • GRAS
      • HIRS
      • IASI
      • MHS
      • SARP-3
      • SARR
      • SEM

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · Proba-V opens its eyes
    • · First new Galileo satellite arrive…
    • · Next destination: space
    • · Leak repaired on International Spa…
    • · After Chelyabinsk: European expert…
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions