• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

      • Media
      • ESA TV
      • Videos for professionals
      • Photos
    • For Educators

    • For Kids

    • ESA

    • Observing the Earth

    • Living Planet

    • Meteorological missions

    • MetOp

    • MetOp at a glance
    • Overview
    • Why we need MetOp
    • Facts & figures
    • History
    • Satellite

      • About the satellite
      • Payload Module
      • Service Module
    • Instruments

      • Overview
      • Technical summary
    • Launch

      • Launch sequence
      • Launcher
    • Mission operations

      • Operations
      • Orbit
    • Resources

      • Publications
      • General links
      • Glossary
      • Acronym list
    • Multimedia
    • MetOp images
    • MetOp videos
    • MetOp animations
    • Help
    • Services
    • Subscribe

    ESA > Our Activities > Observing the Earth > The Living Planet Programme > Meteorological missions > MetOp

    MetOp integrated with Fregat upper-stage

    MetOp joins the Fregat upper-stage
    26 September 2006

    As the launch campaign continues on track, the MetOp satellite has been successfully mated to the Fregat upper-stage.

    As both the satellite and the upper-stage engine remain fuelled, the integration is potentially hazardous. Nevertheless, this delicate operation was carried out very smoothly with everything going according to plan.

    Before this took place the Fregat had been tested in an end-to-end configuration using simulators for the launcher, the launch vehicle adapter and the satellite.


    Inspecting the fairing
    Inspecting the fairing

    In addition to the mating, other important activities over the weekend have involved an inspection of the fairing and the reinstallation of the network data interface unit, which connects the satellite on the launch pad with the ground control centre in Darmstadt, Germany. Other routine operations continue to be carried out such as the check-out of Fregat’s electrical systems along with charging the batteries on-board MetOp.

    As the launch campaign continues on schedule, the MetOp satellite and Fregat upper-stage will be encapsulated in the fairing on 28 September and, as the so-called upper composite, transported by overnight train to the launch vehicle integration hall. The upper composite will then be integrated with the Soyuz rocket on 30 September. Rollout to the launch pad will take place on 4 October followed by launch on 7 October.

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    24
    Tweet
    • Launch diary
      • MetOp launch status
        • Europe's first polar-orbiting weather satellite ready for launch
          • Integration of MetOp upper-composite and third-stage complete
            • Safe arrival at the launch facility for MetOp
              • MetOp encapsulated in fairing
                • MetOp integrated with Fregat upper-stage
                  • MetOp launch campaign resumed
                    • MetOp to be launched in October
                      • Launch of MetOp-A postponed
                        • MetOp ready for launch
                          • Upper-composite transferred to launcher integration facility
                            • Last-ever look at MetOp
                              • MetOp joins Fregat upper-stage
                                • MetOp fuelled and pressurised
                                  • MetOp-A gets green light for 17 July launch date
                                    • MetOp – last phase of testing before launch
                                      • MetOp satellite shipped to Baikonur on 18 April
                                      • In depth
                                        • Soyuz launch vehicle
                                        • Baikonur
                                        • Related links
                                        • Eumetsat
                                        • EADS-Astrium
                                        • Starsem
                                        • NOAA
                                        • CNES

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · Rare merger reveals secrets of gal…
    • · Watching for hazards: ESA opens as…
    • · ESA astronaut Timothy Peake set fo…
    • · Space drives e-mobility
    • · Proba-V opens its eyes
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions