• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

      • Media
      • ESA TV
      • Videos for professionals
      • Photos
    • For Educators

    • For Kids

    • ESA

    • Operations

    • Ground Systems Engineering

    • Space Debris

    • SSA

    • Operations
    • Operations home
    • Background
    • About Operations
    • The Right Stuff
    • Multimedia

      • Images
      • Videos
    • SSA programme
    • Space Situational Awareness
    • Teams on ground
    • Ground Systems Engineering
    • EGOS - Ground operation system
    • Missions in space
    • Solar and planetary
    • Astronomy & fundamental physics
    • Earth observation
    • Human spaceflight
    • Technology demonstration
    • Estrack operations
    • Past missions
    • ESA mission history
    • - Find a mission: A...Z
    • Mission control centres
    • ATV Control Centre (ATV-CC)
    • Columbus Control Centre (Col-CC)
    • Ground stations
    • Estrack tracking stations
    • ESTRACK Control Centre
    • - Find a station: A...Z
    • OPS Community
    • Advanced Operations Concepts Office
    • HSO Exchange
    • Knowledge Management at ESA's Operations team

    ESA > Our Activities > Operations

    Europe’s third cargo vehicle docks with the Space Station

    ATV-3 docking
    29 March 2012

    PR 10 2012 - ESA’s ATV Edoardo Amaldi has completed the first stage of its docking with the Russian Zvezda module of the International Space Station.

    The docking occurred smoothly when ATV’s docking probe was captured by Zvezda’s docking cone at 00:31 CEST ( 22:31 GMT).

    The docking probe is now retracting, to be followed by the hooks between the two craft closing. The data and electrical connections will then be established.

    The 20-tonne vessel, flying autonomously while being continuously monitored from the ground, docked with the 450-tonne orbital complex with a precision of 6 cm as they circled Earth at more than 28 000 km/hr.

    “No-one should consider that this smooth and gentle docking between these two giant spacecraft is either an easy or routine task,” said Thomas Reiter, ESA’s Director of Human Spaceflight and Operations.

    “The technologies we have demonstrated in operational conditions with the ATVs have a tremendous potential for future human spaceflight and exploration missions.”

    The docking concluded a step-by-step approach to the orbital outpost by the large freighter. The vehicle manoeuvred autonomously during these critical operations, monitored by a separate onboard control system to ensure the safety of the Station and its crew.


    ATV Control Centre

    The ground teams at the ATV Control Centre in Toulouse as well as ESA astronaut André Kuipers and his crewmates on the Station were also watching the approach, in case a hold or an abort had to be ordered.

    Like its predecessors, ATV-3 has a multifaceted mission. As a space tug, it is loaded with 3150 kg of propellant to reboost the Station’s orbit to compensate for the natural decay in altitude caused by atmospheric drag or to move it from the path of potentially hazardous space debris. ATV also provides attitude control when other spacecraft are approaching the Station.

    As a space tanker, it is delivering 860 kg of propellant, 100 kg of oxygen and air, and 280 kg of drinking water, all to be pumped into the Station’s tanks.

    As a space freighter, it carries 2200 kg of dry cargo such as scientific equipment, spare parts, food and clothes for the astronauts.

    ATV docking training on Station

    During the five months it will spend docked to the Station, it will act as a temporary space module, providing 45 cubic metres of extra crew quarters on the orbital outpost. On previous missions, ATV was welcomed by the astronauts as “the quietest place in the Station” and was often the preferred area for working.

    At the end of its mission, scheduled for 27 August, ATV-3 will separate from the Station, packed with waste bags. The following day, it will be directed to burn up safely in the atmosphere during reentry over the South Pacific Ocean.

    For more information about ATV, please visit

    http://www.esa.int/ATV

    For further information, please contact:

    ESA Media Relations Office

    Communication Department

    Tel: +33 1 53 69 72 99

    Fax: +33 1 53 69 76 90

    Email: media@esa.int

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    196
    Tweet
    • Automated Transfer Vehicle
    • Follow the ATV Johannes Kepler misison via ESA's ATV blog
      Follow the ATV Johannes Kepler misison via ESA's ATV blog
      ATV blog
    • Videos
    • Watch full launch retransmission
    • ATV-3 docking
    • Watch full docking retransmission
    • More news
      • Mission accomplished for ATV Edoardo Amaldi
        • ATV undocked
          • ATV-3 set for overnight undocking
            • So long… and thanks for all the oxygen
              • Learn to dock ATV the astronaut way
                • Busy first days for ATV Edoardo Amaldi
                  • ATV music video: Back at the ISS
                    • Artemis: the ATV whisperer
                      • Europe’s third cargo vehicle docks with the Space Station
                        • Europe’s smart supply ship on its way to Space Station
                          • ATV-3 launch
                            • Crucial first steps in ATV’s orbital journey
                              • ATV Edoardo Amaldi set for liftoff
                                • ATV-3 launch preparations going on
                                  • New target launch date for ATV-3
                                    • ATV launch delayed
                                      • Europe’s ATV space ferry set for launch to Space Station
                                        • ATV Edoardo Amaldi arrives in Kourou
                                        • Related documents
                                        • ATV Factsheet
                                        • ATV-3 Edoardo Amaldi mission logo
                                          ATV-3 Edoardo Amaldi mission logo
                                          ATV-3 Mission logo
                                        • Multimedia
                                        • ATV on Flickr
                                        • ATV-3 Poster
                                        • ATV video gallery

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • ESA Operations Twitter

    Follow ESA operations

    • LATEST ARTICLES
    • · Rare merger reveals secrets of gal…
    • · Watching for hazards: ESA opens as…
    • · ESA astronaut Timothy Peake set fo…
    • · Space drives e-mobility
    • · Proba-V opens its eyes
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions