• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

      • Media
      • ESA TV
      • Videos for professionals
      • Photos
    • For Educators

    • For Kids

    • ESA

    • Space Science

    • Our Universe
    • About Space Science
    • ESA's 'Cosmic Vision'
    • Science missions
    • Mission navigator
    • Target groups
    • For Media
    • For Scientists
    • For Kids
    • Multimedia
    • Science images
    • Science videos
    • Animations
    • Downloads
    • Sounds from space
    • Resources
    • Reference section
    • Services
    • FAQs
    • Glossary
    • Help
    • Portal terms of use
    • Comments
    • Follow us
    • RSS feeds
    • ESA Sci on Twitter
    • ESA Space Science Images on Flickr
    • ESA 3D on Flickr

    ESA > Our Activities > Space Science > Exploring space

    SMART-1 sets off for the Moon

    SMART-1 lift off
    29 September 2003

    SMART-1, Europe’s first science spacecraft to be sent to the Moon, was flawlessly launched during the night of 27/28 September 2003.

    The Ariane-5 launcher lifted off from Europe’s spaceport at Kourou, French Guiana, at 8.14 p.m. local time (1.14 a.m. CEST on 28 September), with three spacecraft on board, including ESA’s SMART-1.

    At 42 minutes after launch, all three satellites were released. While the other two satellites move into geostationary orbit high above the Earth, SMART-1 begins its much longer journey to the Moon. The spacecraft has deployed its solar arrays and is currently undergoing initial check-out of its systems by the ESA Space Operations Centre (ESOC).

    Next key steps

    SMART-1

    30 September - First firing of the ion engine. This will raise the lowest point of its orbit from 750 to 20 000 kilometres above the Earth, taking about 80 days to complete.

    October 2003 - Check-out of systems complete. ESOC will be in contact with SMART-1 for two 8-hour periods every week.

    November 2003 – Over the next few months, the ion engine fires to raise the highest point of its orbit to match the orbit of the Moon.

    December 2004 - February 2005 – SMART-1 performs three gravity-assist manoeuvres while flying by the Moon.

    March 2005 - SMART-1 ‘captured’ by the Moon’s gravity, entering a near-polar elliptical lunar orbit.

    April 2005 - Second phase of the mission begins, the six-month study of the Moon.

    (These dates are highly dependent on the actual conditions of flight, and may change.)

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    4
    Tweet
    • More about...
    • Looking at the Moon
      • SMART-1
      • Related articles
        • Testing spacecraft
          • Getting ready for launch
            • Gone to the Moon...
              • Ion drives: Science fiction or science fact?

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · Rare merger reveals secrets of gal…
    • · Watching for hazards: ESA opens as…
    • · ESA astronaut Timothy Peake set fo…
    • · Space drives e-mobility
    • · Proba-V opens its eyes
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions