• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • ESA Science

    • Mars Express

    • Europe goes to Mars

      • Europe reclaims a stake in Mars exploration
      • Space age transforms our knowledge about Mars
    • About Mars Express

      • Mars Express mission facts
      • Mars Express instruments
      • The mission
      • The spacecraft
      • The launcher
    • About Mars

      • Geography of Mars
      • Water on early Mars?
      • Signatures of life
      • Facts about Mars
    • Meet the team

      • International collaboration
      • Project Manager
      • Project Scientist
      • Mars Lead Scientist
      • Principal Investigators
      • Operations
      • Industry
    • Multimedia
    • VideoTalk
    • Mars Express images
    • Mars Express videos
    • HRSC videos
    • Animation in 11 languages
    • Download wallpapers
    • Download screensavers
    • 3D Flash 'model'
    • Make a model
    • Services
    • Comments

    ESA > Our Activities > Space Science > Mars Express

    "A whole lot of heating going on"

    Team during the thermal test
    8 November 2002

    Mars Express launch diary 1

    This week Don McCoy, Mars Express Assembly Integration and Verification Engineer, reports on the tests needed to prepare the spacecraft for its journey to Mars.

    "What we're mainly busy with this month is the very important Thermal Balance/Thermal Vacuum test. In this test, we subject the satellite to a simulated space vacuum and to extreme hot and cold. The aim is to prove the satellite's ability to withstand the gruelling thermal environment during the mission. The test lasts about 2 weeks. It's quite tough on the teams because they have to work 24 hours a day to ensure the safety of the satellite and to perform the necessary operations.

    The satellite in the vacuum chamber with simulated Sun illumination

    "As regards the people working here, there's about 50 of us, in various teams. Some do rotating 12-hour shifts, some 8-hour shifts. Maybe you're wondering how I stay awake at the end of such long shifts? I drink lots of coffee and try to stay focused on my work. I have to admit about 4 am, I'm usually quite tired and I need to move in order to stay awake. I think we're all anticipating the end of the test now.

    "Of course, we've had some problems, you often do in such complex tests as this. However, in each case, the teams have worked together to resolve them. Presently we're proceeding on schedule. It has been an enormous effort to prepare and conduct the test, and we'll be glad to finish it. However, I think we can be quite proud of how well things have gone.


    The satellite in the vacuum chamber with simulated Sun illumination

    "After completion of the thermal test, we prepare the spacecraft for vibration testing. We add special instrumentation and complete the building of the satellite by attaching the high-gain antenna, the Beagle 2 lander simulator, and the solar arrays. We'll test the mechanical behaviour of the flight spacecraft. In this way, the vibration tests will verify that the satellite can withstand the hair-raising ride to space on board the Soyuz rocket."

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    16
    facebook
    twitter
    reddit
    google plus
    digg
    tumbler
    digg
    blogger
    myspace
    • Launch diary
      • Ready for lift off!
        • Ground control to Mars Express
          • Filling up for the long journey
            • "All along the launch tower"
              • It all started with Gagarin
                • Preparing the Mars Express launch in Baikonur
                  • "Leaving on a jet plane"
                    • Packing for Mars
                      • No one will ever hear you outside this chamber
                        • "Putting on weight at Christmas?"
                          • "After the vacuum, things may get nasty"
                            • "A whole lot of heating going on"

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · CryoSat hits land
    • · Ariane 5 completes seven launches …
    • · Measuring skull pressure without t…
    • · Malargüe station inauguration
    • · The solar wind is swirly
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions