• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • Launch Special

    • Planck

    • Herschel

    • ESA Science

    • About Planck

      • Planck at a glance
      • Science objectives
      • Planck highlights
      • History of microwave astronomy
    • The Microwave Universe

      • Why the microwave
      • Key questions
    • The spacecraft

      • Vital stats
      • Telescope
      • Instruments
      • Sophisticated spacecraft
    • The mission

      • Journey
      • Launch and early operations
      • Operating Planck
    • Meet the team

      • Planck Project Scientist: An interview with Jan Tauber
      • Herschel and Planck Programme Manager: An interview with Thomas Passvogel
    • Multimedia
    • Planck images
    • Planck videos
    • Science@ESA vodcast

    ESA > Our Activities > Space Science > Planck

    Launch and early operations

    Launcher fairing ejection

    The Launch and Early Operations Phase (LEOP) is the period immediately after launch when critical operations are carried out by the Mission Control Team. For Herschel and Planck, this phase began as soon as the first signal was acquired from the launcher, about 36 minutes after launch on 14 May 2009; it lasted for most of 5 days, and included a number of orbit correction manoeuvres.

    During LEOP, the satellites were monitored 22 hrs/day using ESA’s Deep Space Stations at New Norcia, Australia (primary ground station); Cebreros, Spain; Perth, Australia; Maspalomas, Spain; and Kourou, French Guiana.

    The Ariane 5 solid rocket boosters separated from the upper stage of the launcher approximately 2.5 minutes after launch, and the fairing was jettisoned about 4 minutes after launch.

    Planck separation

    Herschel separated from the upper stage about 26 minutes after launch. After this, the upper stage reoriented itself away from Herschel and ejected the Sylda, a protective cover under which Planck was kept during launch. The upper stage then reoriented to the correct attitude and was spun up, allowing Planck (which must spin at about 1 rpm to conduct its observations) to separate.

    Planck has no dedicated engine for trajectory manoeuvres, so the satellite will use its thrusters for any trajectory corrections.


    Planck's cruise to L2

    Right after separation, the thrusters were used for one trajectory correction manoeuvre, and another was conducted about 30 hours after separation. Another follow-up manoeuvre for fine-tuning and two more manoeuvres were executed along the way to L2. The third and last manoeuvre on 2 July inserted Planck into its final orbit around L2.

    The cooling phase and commissioning phase are running in parallel. The satellite’s detectors reached their lowest temperature of 0.1K above absolute zero in the first week of July. During commissioning, all of the satellite’s subsystems (power, thermal control etc.) are turned on and verified as working normally.

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    41
    facebook
    twitter
    reddit
    google plus
    digg
    tumbler
    digg
    blogger
    myspace
    • Planck: looking back at the dawn of time
    • Spacecraft Operations
      Spacecraft Operations
      Operations
    • Related articles
      • Journey
        • Launch and early operations
          • Operating Planck
          • Read more
            • What are Lagrange points?
              • L2, the second Lagrangian Point
                • Cosmic Microwave Background (CMB) radiation
                  • So, how did everything start?
                    • The electromagnetic spectrum
                    • In depth
                    • Planck in depth
                    • Planck Science Team

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · CryoSat hits land
    • · Ariane 5 completes seven launches …
    • · Measuring skull pressure without t…
    • · Malargüe station inauguration
    • · The solar wind is swirly
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions