Monday 14th September – Today is a day for packing up: with Proba-2 fully integrated and system testing concluded, in a couple of days the team is leaving Plesetsk… at least temporarily.

Now is the turn of the SMOS launch team to arrive, to prepare their satellite for launch – the two ESA missions sharing the same launcher.

The Proba-2 team is however returning in mid October, for the second part of the launch campaign. This will be dedicated to the integration of little Proba-2 with the launcher adapter, and its mating with the rocket upper stage, after which the satellite’s ‘big brother’ SMOS gets placed on top of it in the launcher fairing. Until this point however, Proba-2 stays stored in its container in the clean room, and all the team’s ground support equipment is also being secured.

The aim of today’s packing is to enable the swift redeployment all equipment once the team returns, when joint operations with the SMOS team will take place. At 15:00 Proba-2 is back in its container, to the satisfaction and relief of the whole team. It’s goodbye to Proba-2, and… see you in three weeks!

It is from this little room that the team will, in a matter of weeks, be performing battery health monitoring and charging of Proba-2 up to launch day. Meanwhile at the MIK all data gathered during yesterday’s testing undergoes thorough analysis.

That night a formal dinner event takes place at the team’s hotel, attended by representatives of all involved parties to celebrate the successful conclusion of the first Proba-2 launch campaign phase.

Related Links

Proba-2, final checks
Enabling & Support

Entry 1: Belgium says goodbye to Proba-2

466 views 0 likes
Read
Loading of Proba-2 container in cargo plane at Brussels airport
Enabling & Support

Entry 2: Proba-2's journey to Plesetsk

482 views 0 likes
Read
Transport of Proba-2 container to the MIK
Enabling & Support

Entry 3: Unpacking after the trip

351 views 1 likes
Read
Opening of the Proba-2 satellite container in the cleanroom
Enabling & Support

Entry 4: Proba-2 unloaded and ready for inspection

417 views 0 likes
Read
Hoisting of satellite from its container and assembly of integration dolly
Enabling & Support

Entry 5: Proba-2 powered up

440 views 0 likes
Read
Inspection of Proba-2 internal compartments
Enabling & Support

Entry 6: End-to-end testing

606 views 0 likes
Read
Filling of the propulsion tank with xeon
Enabling & Support

Entry 7: Filling Proba-2 up with xenon

518 views 0 likes
Read
Mounting of the first deployable solar panel
Enabling & Support

Entry 8: Proba-2 gains a solar panel

541 views 0 likes
Read
Mounting of solar panel
Enabling & Support

Entry 9: Proba-2 gains its second ‘wing’

362 views 0 likes
Read
Proba-2 with solar panels mounted
Enabling & Support

Entry 10: Completing Proba-2

372 views 0 likes
Read
Proba-2 final full functional test
Enabling & Support

Entry 11: Putting Proba-2 to the test

451 views 0 likes
Read
Proba-2 launch team group picture at the museum
Enabling & Support

Entry 12: Checking launch tower links

369 views 0 likes
Read
Proba-2 back in its storage container in the cleanroom
Enabling & Support

Entry 13: Letting SMOS take its turn

416 views 0 likes
Read
Proba-2 team arrival at Plesetsk Cosmodrome
Enabling & Support

Entry 14: Second phase of Proba-2 launch campaign begins

398 views 0 likes
Read
ESP mounting on the final panel
Enabling & Support

Entry 15: Last bolts tightened on Proba-2

390 views 0 likes
Read
Proba-2
Enabling & Support

Entry 16: A short journey off the ground – Proba-2 mated to…

399 views 0 likes
Read
Proba-2 in its final launch position, on top of Breeze
Enabling & Support

Entry 17: Proba-2 mated onto Breeze upper stage

527 views 0 likes
Read
Removal of Proba-2 protective covers
Enabling & Support

Entry 18: Encapsulated, Proba-2 vanishes from view forever

430 views 0 likes
Read
Encapsulation
Enabling & Support

Entry 19: Proba-2 in place and powered up

376 views 0 likes
Read
SMOS, Proba-2 and Khrunichev teams
Enabling & Support

Entry 20: Rail ride to the launch pad

513 views 1 likes
Read
Joined dress rehearsal of Proba-2 and SMOS in MCC
Enabling & Support

Entry 21: Far-flung dress rehearsal for launch

889 views 0 likes
Read