Wednesday 14th & Thursday 15th October - Wednesday sees the team perform electrical checkouts of the launcher cables, to be used for Proba-2 battery monitoring and charging in advance of its launch. This activity marks the first joint operations with the Khrunichev and Russian military launcher authorities.

As well as this checkout the battery is also fully charged and the spacecraft prepared for its imminent mechanical and electrical mating to the Proba-2 Adapter System, which secures the spacecraft in place below its fellow ESA satellite SMOS during their joint trip into orbit.

Proba-2 mated onto its Adapter System
Proba-2 mated onto its Adapter System

The following day – and still a day ahead of schedule – the spacecraft is mated onto this Adapter System. In preparation for this operation – which is designated a ‘key inspection point’ (KIP) in the launch schedule – the team has first to fill in a formal entry declaring ‘Proba-2 Spacecraft Readiness for Mating’ in the Launcher Logbook, done during the team’s standard morning meeting.

Think of the process as a ‘marriage’ between the two systems. First the spacecraft is lifted by crane onto the Adapter System, next they are mechanically mated together by the Verhaert launch team, then connected together electrically through their two umbilical connectors. Finally an electrical checkout verifies that the connections have been properly made.

The combined Proba-2 and adapter system are then lifted onto a dolly, ready to be mated in turn to the fully fuelled Breeze-KM – the upper stage of the three-stage Rockot launcher which will deliver Proba-2 and SMOS into orbit – which arrived in the Plesetsk MIK today.

Related Links

Proba-2, final checks
Enabling & Support

Entry 1: Belgium says goodbye to Proba-2

466 views 0 likes
Read
Loading of Proba-2 container in cargo plane at Brussels airport
Enabling & Support

Entry 2: Proba-2's journey to Plesetsk

482 views 0 likes
Read
Transport of Proba-2 container to the MIK
Enabling & Support

Entry 3: Unpacking after the trip

351 views 1 likes
Read
Opening of the Proba-2 satellite container in the cleanroom
Enabling & Support

Entry 4: Proba-2 unloaded and ready for inspection

417 views 0 likes
Read
Hoisting of satellite from its container and assembly of integration dolly
Enabling & Support

Entry 5: Proba-2 powered up

440 views 0 likes
Read
Inspection of Proba-2 internal compartments
Enabling & Support

Entry 6: End-to-end testing

606 views 0 likes
Read
Filling of the propulsion tank with xeon
Enabling & Support

Entry 7: Filling Proba-2 up with xenon

518 views 0 likes
Read
Mounting of the first deployable solar panel
Enabling & Support

Entry 8: Proba-2 gains a solar panel

541 views 0 likes
Read
Mounting of solar panel
Enabling & Support

Entry 9: Proba-2 gains its second ‘wing’

362 views 0 likes
Read
Proba-2 with solar panels mounted
Enabling & Support

Entry 10: Completing Proba-2

372 views 0 likes
Read
Proba-2 final full functional test
Enabling & Support

Entry 11: Putting Proba-2 to the test

451 views 0 likes
Read
Proba-2 launch team group picture at the museum
Enabling & Support

Entry 12: Checking launch tower links

369 views 0 likes
Read
Proba-2 back in its storage container in the cleanroom
Enabling & Support

Entry 13: Letting SMOS take its turn

416 views 0 likes
Read
Proba-2 team arrival at Plesetsk Cosmodrome
Enabling & Support

Entry 14: Second phase of Proba-2 launch campaign begins

398 views 0 likes
Read
ESP mounting on the final panel
Enabling & Support

Entry 15: Last bolts tightened on Proba-2

390 views 0 likes
Read
Proba-2
Enabling & Support

Entry 16: A short journey off the ground – Proba-2 mated to…

399 views 0 likes
Read
Proba-2 in its final launch position, on top of Breeze
Enabling & Support

Entry 17: Proba-2 mated onto Breeze upper stage

527 views 0 likes
Read
Removal of Proba-2 protective covers
Enabling & Support

Entry 18: Encapsulated, Proba-2 vanishes from view forever

430 views 0 likes
Read
Encapsulation
Enabling & Support

Entry 19: Proba-2 in place and powered up

376 views 0 likes
Read
SMOS, Proba-2 and Khrunichev teams
Enabling & Support

Entry 20: Rail ride to the launch pad

513 views 1 likes
Read
Joined dress rehearsal of Proba-2 and SMOS in MCC
Enabling & Support

Entry 21: Far-flung dress rehearsal for launch

889 views 0 likes