Monday 19 October – Proba-2 comes one step closer to space, and the launch team see it for the final time, as the miniature satellite is encapsulated by the SMOS adapter system and the full-sized satellite attached to it.

The day’s activities begin with the removal of the remaining protective covers, such as the three soft covers over Proba-2’s star trackers and the star tracker experiment being carried out on behalf of the BepiColombo mission, as well as the hard covers above the satellite’s three solar panels. This is the last mechanical activity to be carried out on the spacecraft by the Verhaert Design & Development team.

Proba-2 Certification of Readiness for Encapsulation
Proba-2 Certification of Readiness for Encapsulation

After a final inspection of Proba-2 to formally check that all protective covers have now been safely removed the satellite is certified as ready for encapsulation.

 

At the same time a customised SMOS lifting device is being prepared to pick up the SMOS satellite and its adapter system. For the Verhaert team this is a breathtaking moment – they are about to lose sight of ‘their’ Proba-2 forever.

SMOS and its adapter mated on Breeze encapsulating Proba-2
SMOS and its adapter mated on Breeze encapsulating Proba-2

The Russian launcher authorities take over the hoisting operation and everyone finds themselves wondering whether the height of the crane will be able to provide sufficient clearance to lift the SMOS ‘stack’ above Proba-2 on the Breeze-KM upper stage.

In the end the authorities manage the operation in a perfect manner, being carefully guided by a set of dedicated alignment rods. While SMOS and its adapter are lowered onto Proba-2 the team concentrate on the steadily shrinking clearance between the two. Centimetre by centimetre the team witness their small satellite disappearing until it is entirely encapsulated within its new habitat.

This marks a very emotional moment for the team: they are letting go of their ‘baby’ after more than five years of work on the project, except for a tiny electrical umbilical which allows them to perform ongoing electrical monitoring of the satellite’s health.

Related Links

Proba-2, final checks
Enabling & Support

Entry 1: Belgium says goodbye to Proba-2

466 views 0 likes
Read
Loading of Proba-2 container in cargo plane at Brussels airport
Enabling & Support

Entry 2: Proba-2's journey to Plesetsk

482 views 0 likes
Read
Transport of Proba-2 container to the MIK
Enabling & Support

Entry 3: Unpacking after the trip

351 views 1 likes
Read
Opening of the Proba-2 satellite container in the cleanroom
Enabling & Support

Entry 4: Proba-2 unloaded and ready for inspection

417 views 0 likes
Read
Hoisting of satellite from its container and assembly of integration dolly
Enabling & Support

Entry 5: Proba-2 powered up

440 views 0 likes
Read
Inspection of Proba-2 internal compartments
Enabling & Support

Entry 6: End-to-end testing

606 views 0 likes
Read
Filling of the propulsion tank with xeon
Enabling & Support

Entry 7: Filling Proba-2 up with xenon

518 views 0 likes
Read
Mounting of the first deployable solar panel
Enabling & Support

Entry 8: Proba-2 gains a solar panel

541 views 0 likes
Read
Mounting of solar panel
Enabling & Support

Entry 9: Proba-2 gains its second ‘wing’

362 views 0 likes
Read
Proba-2 with solar panels mounted
Enabling & Support

Entry 10: Completing Proba-2

372 views 0 likes
Read
Proba-2 final full functional test
Enabling & Support

Entry 11: Putting Proba-2 to the test

451 views 0 likes
Read
Proba-2 launch team group picture at the museum
Enabling & Support

Entry 12: Checking launch tower links

369 views 0 likes
Read
Proba-2 back in its storage container in the cleanroom
Enabling & Support

Entry 13: Letting SMOS take its turn

416 views 0 likes
Read
Proba-2 team arrival at Plesetsk Cosmodrome
Enabling & Support

Entry 14: Second phase of Proba-2 launch campaign begins

398 views 0 likes
Read
ESP mounting on the final panel
Enabling & Support

Entry 15: Last bolts tightened on Proba-2

390 views 0 likes
Read
Proba-2
Enabling & Support

Entry 16: A short journey off the ground – Proba-2 mated to…

399 views 0 likes
Read
Proba-2 in its final launch position, on top of Breeze
Enabling & Support

Entry 17: Proba-2 mated onto Breeze upper stage

527 views 0 likes
Read
Removal of Proba-2 protective covers
Enabling & Support

Entry 18: Encapsulated, Proba-2 vanishes from view forever

430 views 0 likes
Read
Encapsulation
Enabling & Support

Entry 19: Proba-2 in place and powered up

376 views 0 likes
Read
SMOS, Proba-2 and Khrunichev teams
Enabling & Support

Entry 20: Rail ride to the launch pad

513 views 1 likes
Read
Joined dress rehearsal of Proba-2 and SMOS in MCC
Enabling & Support

Entry 21: Far-flung dress rehearsal for launch

889 views 0 likes
Read