Entry 20: Rail ride to the launch pad
Friday 23 October to Tuesday 27 October - The weekend sees the launcher authorities finalise electrical checkouts of the combined Proba-2, SMOS and Breeze-KM upper stage – collectively known as the space head - in the MIK 101b cleanroom and the General Hall. As this goes on the electrical health of Proba-2 is monitored on a near continuous basis and on Saturday the spacecraft's flight battery is fully charged.
On Monday morning, a joint photo is taken of the combined Proba-2, SMOS and Krunichev teams in front of the space head. After this preparations for the launch pad roll-out of the space head begin: a thermal blanket is applied to the space head after which it is lifted onto a dedicated rail car.
Following this operation the team has the chance to fully charge the Proba-2 flight battery once again, prior to its journey to the launch pad. This is the Proba-2's last task in the context of launch preparations at the Plesetsk MIK. From here on in, activities are continuing in the undertable room of the Rockot launch pad.
The roll-out of the space head from the MIK to launch pad takes place on Tuesday mornng. The rail car sets off at 6:00, and arrives on the launch pad around 10:00. After arrival, the launcher authorities immediate prepare for the lifting and mating of the Space Head on top of the Rockot's second stage.
In the meantime the Proba-2 team transports its electrical ground segment equipment to the undertable room. This very small room underneath the launch pad is where the team will be reconnecting their electrical ground support equipment (EGSE) to the Proba-2 spacecraft via umbilical links on Wednesday evening.
In parallel to all these activities several meetings are devoted to preparing for a joint dress rehearsal due to take place during Wednesday and Thursday.
Last update: 27 October 2009
- Entry 1: Belgium says goodbye to Proba-2
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_1_Belgium_says_goodbye_to_Proba-2 - Entry 2: Proba-2's journey to Plesetsk
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_2_Proba-2_s_journey_to_Plesetsk - Entry 3: Unpacking after the trip
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_3_Unpacking_after_the_trip - Entry 4: Proba-2 unloaded and ready for inspection
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_4_Proba-2_unloaded_and_ready_for_inspection - Entry 5: Proba-2 powered up
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_5_Proba-2_powered_up - Entry 6: End-to-end testing
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_6_End-to-end_testing - Entry 7: Filling Proba-2 up with xenon
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_7_Filling_Proba-2_up_with_xenon - Entry 8: Proba-2 gains a solar panel
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_8_Proba-2_gains_a_solar_panel - Entry 9: Proba-2 gains its second ‘wing’
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_9_Proba-2_gains_its_second_wing - Entry 10: Completing Proba-2
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_10_Completing_Proba-2 - Entry 11: Putting Proba-2 to the test
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_11_Putting_Proba-2_to_the_test - Entry 12: Checking launch tower links
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_12_Checking_launch_tower_links - Entry 13: Letting SMOS take its turn
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_13_Letting_SMOS_take_its_turn - Entry 14: Second phase of Proba-2 launch campaign begins
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_14_Second_phase_of_Proba-2_launch_campaign_begins - Entry 15: Last bolts tightened on Proba-2
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_15_Last_bolts_tightened_on_Proba-2 - Entry 16: A short journey off the ground – Proba-2 mated to its adapter
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_16_A_short_journey_off_the_ground_Proba-2_mated_to_its_adapter - Entry 17: Proba-2 mated onto Breeze upper stage
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_17_Proba-2_mated_onto_Breeze_upper_stage - Entry 18: Encapsulated, Proba-2 vanishes from view forever
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_18_Encapsulated_Proba-2_vanishes_from_view_forever - Entry 19: Proba-2 in place and powered up
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_19_Proba-2_in_place_and_powered_up - Entry 20: Rail ride to the launch pad
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_20_Rail_ride_to_the_launch_pad - Entry 21: Far-flung dress rehearsal for launch
http://www.esa.int/Our_Activities/Technology/Proba_Missions/Entry_21_Far-flung_dress_rehearsal_for_launch

