ESACDFSystems EngineeringESTEC
   
About CDF
What is the CDF?What is concurrent engineering?The FacilityDesign Stations 1/2Design Stations 2/2Walk Through the CDFCDF history
Activities
Studies/ReviewsPoster
Multimedia
CDF imagesCDF Wallpaper (176 kb)Interactive posterCDF Presentation
Services
Contact us
 
 
 
Bookmark and Share
 
 
 
 
Article Images
Space Mission Operations – Designing for the Future
 
23 February 2012

OPS-SAT Study Team at the end of the Internal Final Presentation. Note that the team leader is holding the 1:1 scale model of the final design.
 
 
OPSSAT team members discussing aspects of the study around the 1:1 scale rapid prototype of the cubesat (on the table)
 
 
CAD drawing showing proposed OPS-SAT with solar arrays deployed
 


 
 
 
   Copyright 2000 - 2006 © European Space Agency. All rights reserved.