ESAIntegralESA Science
   
Integral in brief
Integral overviewIntegral factsheetA truly international mission
About Integral
The spacecraftThe launcherThe launch site - BaikonurThe journey
Integral's mission
Multimedia
Image gallery
Pre-launch images, Sept 2002
Pre-launch images, October 2002Video gallery3D Flash 'model'Make a model Bookmark and Share
 
 
 
 
 
printer friendly page
September 2002
 
19.09.02 SCAPE suit used in fueling operations
 
 
20.09.02 Final assembly work on Proton’s first 3 stages for Integral
 
 
21.09.02. Dressed in SCAPE suits preparing for fuelling
 
 
21.09.02 Dressing in the Scape suit
 
 
21.09.02 Fuelling operations being checked on the monitors
 
 
Test conductors
21.09.02. Test conductors
 
 
21.09.02. Back-up team
 
 
The observer team
21.09.02 The observer team, double-checking the completion of the step-by-step procedure
 
 
30.09.02. Sailing across the clean room
 
 
30.09.02 Integral approaches the gantry
 
 
Last update: 29 September 2004
 


Diary updates
Introducing our man in Baikonur15 October 200215 October 200214 October 200212 October11 October8 - 10 October30 September - 4 October22 - 29 September1 - 21 September17 - 30 August
 
 
 
   Copyright 2000 - 2010 © European Space Agency. All rights reserved.