ESAIntegralESA Science
   
Integral in brief
Integral overviewIntegral factsheetA truly international mission
About Integral
The spacecraftThe launcherThe launch site - BaikonurThe journey
Integral's mission
Multimedia
Image galleryPre-launch images, Sept 2002Pre-launch images, October 2002Video gallery3D Flash 'model'Make a model Bookmark and Share
 
 
 
 
 
printer friendly page
11.10.02  waiting for rollout
11.10.02 Proton on the train waiting for rollout
11 October - Proton declared ready for rollout
 
Today 11.10 at 18:30 local time, the State Commission, comprising all the representatives of Russian entities involved in a Proton launch, as well as Kai Clausen, Integral Project Manager, met to review the readiness of the launcher to be rolled out to the pad.
 
The commission's conclusions are positive and we are scheduled to witness the rollout on the 12th at 6:30 in the morning, local time.

Prior to the commission's meeting, work continued on the Proton itself. It was lifted from its integration rig and moved to a special railcar. The train is now complete and is formed by a locomotive, a thermal car, containing an air conditionning system and a vibration monitoring station and the Proton itself.  
 
Last update: 15 October 2002

 


ESA's gamma-ray astronomy missionArtist's view of Integral
Observations: Seeing in the gamma-ray wavelengthsObservations: Seeing in X-ray wavelengths
Related links
Sci & Tech Integral pageIntegral Science Operations CentreIntegral Science Data Centre
Diary updates
Introducing our man in Baikonur15 October 200215 October 200214 October 200212 October8 - 10 October30 September - 4 October22 - 29 September1 - 21 September17 - 30 August
 
 
 
   Copyright 2000 - 2010 © European Space Agency. All rights reserved.