ESAHomeLaunch VehiclesEurope's SpaceportFuture launchers
   
Strategy for launchers
Launcher strategyFuture Launchers Preparatory ProgrammeInternational cooperationLaunchers and industry
Launcher history
A look at the pastAriane 1, 2, 3Ariane 4
Launches
Previous launchesNext launch
Multimedia
Image galleryVideo galleryRSS feeds
Launchers on your desktop
Screensavers and wallpaper
Services
GlossaryFrequently asked questionsComments
 
 
 
Bookmark and Share
 
 
 
 
Article Images
Vulcain 2 engine now in full production
 
5 April 2005

Antonio Fabrizi (left) shakes hands with Patrick Devedjian (right), the French Minister for Industry, at a ceremony on 4 April at Snecma Moteurs in Verenon France to mark the start of industrial production of the Vulcain 2 engine used by Ariane 5 ECA and, in the future, Ariane 5 ES ATV.

Credits: Snecma
 
 
Testing of Vulcain 2 engine
Download:
 HI RES JPG (Size: 277 kb)
In May 2004 the Ariane 5 ECA Vulcain 2 engine underwent tests at DLR's test facilities at Lampoldshausen in Germany

Credits: ESA
 


Related news
Ariane 5 ECA prepares for launchEnhanced Ariane 5 demonstrates heavy-lift capabilityAriane's Vulcain-2 engine ready for a new test flight
More information
Ariane 5 ECA - New elementsAriane 5 ESAriane 5 ECA Ariane 5 ECA
Related links
SNECMA
 
 
 
   Copyright 2000 - 2012 © European Space Agency. All rights reserved.