ESASpace Engineering
   
Contents
For more information, please contact:
What we do
Directorate of Technical and Quality Management (TEC)
Electrical
Electrical engineeringControl SystemsData SystemsRadio Frequency Payload SystemsElectromagnetics and Space EnvironmentPower and Energy Conversion
Mechanical
Mechanical engineeringThermal ControlStructures and MechanismsMechatronics and Optics, incl. robotics and life supportPropulsion and Aerothermodynamics
Systems
Systems and software engineeringSoftware SystemsSystems Engineering, incl. cost engineeringTechnology programmes
Product Assurance
Product AssuranceFlight SafetyDependabilityQuality Management and AssuranceMaterials and ProcessesElectronic ComponentsSoftware Product Assurance
Standards
Requirements and standardsEuropean Cooperation for Space Standardization (ECSS)European Space Components Coordination (ESCC)
Services
ESA calendar of eventsSubscribe
 
 
 
Bookmark and Share
 
 
 
 
 
printer friendly page
About the Nonconformance Tracking System (NCTS)
 
First released in 2005, Non-conformance Tracking System (NCTS) continues to grow in its importance in supporting ESA project to manage nonconformances (NCs).
 
Currently, there are 2,200 users on 20 different ESA projects across six ESA Directorates who use NCTS to manage over 4,800 NCs.

This web-based application supports the recording, reporting and reviewing of NCs raised against any space product.

It implements the process and requirements specified in ECSS-Q-ST-10-09C (Nonconformance Control System).

Based on a user's access, NCTS determines to which section(s) of a product tree the user has access and whether the user can view or create NCs. The tool allows all details about the NC to be entered online, including the attachment of supporting documentation (e.g. meeting minutes, images, etc.)

NCTS allows Nonconformance Review Board (NRB) members to be notified by email about a new NC which was raised.

The tool supports both Internal NRBs (where a NC is classified as Minor) or Customer NRBs (where a NC is escalated, as it is classifed as Major).  
 
During a NRB, minutes of the meeting can be recorded on-line and actions assigned.

NCTS provides several ways to import or export NC information, including:

  • Importing can be done via MS Excel or XML.
  • Exporting can be done via XML or Zipfile archives.
For example, the XML Interface is now configured on several ESA projects to provide near real-time data sharing with their Primes (e.g. EADS Astrium, Thales Alenia Space).
 
 
NCTS provides the following functionality:
  • Creating, tracking and closing-out NCs.
  • Linking NCs
  • Attaching supporting documentation
  • Change log
  • Notifying NRB Participants
  • Holding Internal/Customer NRBs.
  • Assigning actions
  • Search for NCs or Actions
  • Generate NC Details and Status Reports
  • Import/Export (XML)
  • Import (MS Excel)
  • Export (Zipfile Archive)
The tool provides the following overall benefits:
  • Centralised access to all NC-related information
  • Efficient tracking and monitoring of NCs from initiation to Internal/Customer NRB(s) to close-out
  • Faster turnaround, due to paper-less NC handling
  • ECSS-compliant tool
  • Multiple import/export interfaces available
Specifically for ESA or Industry PA Managers, the tool offers the following advantages:
  • Multiple Internal and Customer NRBs
  • Action tracking
  • NRB notification
  • NC close-out
  • Document attachments
  • Initiator, Customer and Prime classification of NCs
  • Reports: NCR Description and Status List

 
 
For more information, please contact:
 
Raffaele Campagnuolo
NCTS Release Manager/ESA Focal Point
Product Assurance & Safety Department (ESA TEC-QQM)

ESTEC
Keplerlaan 1
2200 AG Noordwijk
The Netherlands

Phone:+31 71 565 6835
Fax: +31 71 565 4798
E-mail: Raffaele.Campagnuolo _at_ esa.int
 
 
Last update: 28 June 2010

 


Latest newsletter
NCTS Newsletter Winter 2011 (pdf)
Previous newsletters
NCTS Newsletter Winter 2010 (pdf)NCTS Newsletter - Summer 2010 (pdf)NCTS Newsletter - Winter 2009 (pdf)NCTS Newsletter - Summer 2009 (pdf)
Related link
Workshop website
Related articles
Quality Management and AssuranceMore space projects using ESA non-conformance tracking tool
Release Notes
NCTS R2.8 Release Note (pdf)
 
 
 
   Copyright 2000 - 2011 © European Space Agency. All rights reserved.