ESAYES2Education
   
YES programme
The YES programme
About YES2
About YES2Mission factsTechnical factsLaunch facts
Young engineers
Team overviewMeet the team
YES2 partners
YES2 partnersCentres of Expertise
YES2 deployment
Observe YES2
YES2 multimedia
Foton Mission Video-On-DemandESA Multimedia galleryImage diaryVideo clipPress fact sheetPresentation Bookmark and Share
 
 
 
 
 
printer friendly page
Integration Manager Fabio with Delta-Utec's Erik and Michiel
Week 1 in pictures
 
Smiles all round
 
The team before the YES2 installation begins. From left: Delta-Utec Director Erik Van Der Heide, YES2 Integration Manager Fabio De Pascale and Delta-Utec lead system Engineer Michiel Kruiff.  
 
The 30 km tether coiled inside FLOYD
30km of coiled Dyneema®
 
YES2 is designed to see if an alternative to chemical rocket de-orbiting is possible. The Dyneema® tether is very strong and in total is 32km long, but only 0.5mm thick!
 
 
Fabio De Pascale, Roger Walker, Michiel Kruiff inspect YES2
Final checks
 
The team conduct final checks on the internal systems of YES2 before the installation on Foton is started. The tether, electrical and electronic system are all checked.
 
 
Left to right: Rafal, Michiel, Roger, Marco, Fabio with YES2
A complete YES2
 
The team can now start thinking about the installation on the Foton.From left: Rafal, the electrical system engineer, Michiel Kruiff, Roger Walker, Marco Stelzer and Fabio De Pascale.
 
 
YES2 is hoisted into the air on a winch and moved to Foton
3, 2, 1 ...Lift off!!
 
In the MIK12 Integration Hall in Baikonur, a roof mounted crane is used to move YES2 into position so that the next stage of the final installation can begin.
 
 
YES2 being lowered onto the Foton
YES2 being lowered onto the Foton
...a little to the left....
 
YES2 is gently lowered onto the Foton battery pack using the roof mounted crane.
 
 
YES2 being attached to the Foton battery pack
YES2 connected
 
Now the Russian technicians carefully make sure that YES2 is connected to the Foton battery pack in the right places.
 
 
Fabio inspecting the final YES2-Foton M3 configuration
YES2 inspection
 
Fabio carefully inspects the final launch configuration between YES2 and Foton to make that everything is correctly connected.
 
 
Marco conducting ground support tests with Michiel
Ground support checks
 
Marco and Michiel start the Ground Support Equipment checks with the help of Julia, a Russian technician at the MIK12 Integration Hall.
 
 
Last update: 8 November 2007
 


More information
YES2 deployment in picturesWeek 3 in pictures - The launch!Week 3 in pictures - The launch! part 2Week 2 in pictures
Web diary
Sites
 
 
 
   Copyright 2000 - 2010 © European Space Agency. All rights reserved.