CryoSat-2 launch: teams in intense preparation


CryoSat-2 Mission Control Team in MCR, ESA/ESOC December 2009
 
CryoSat-2 Mission Control Team in Main Control Room (MCR) at ESA/ESOC, 8 December 2009.

LEOP: Every minute counts
 
CryoSat-2 Flight Control Team members during simulation training
 
CryoSat-2 Flight Control Team members during simulation training 16 December 2009

Dedicated coverage 24 hours/day
 
CryoSat-2 Mission Control Team in MCR, ESA/ESOC December 2009
 
CryoSat-2 Mission Control Team in Main Control Room (MCR) ESA/ESOC, 8 December 2009. Image shows Attitude & Orientation Control System engineer Franz Marchese on console.

CryoSat-2 Mission Control Team in MCR, ESA/ESOC December 2009
 
CryoSat-2 Mission Control Team in Main Control Room (MCR) ESA/ESOC, 8 December 2009.

Preparations continue right up to launch
 
CryoSat-2 Mission Control Team in MCR, ESA/ESOC December 2009
 
Post-simulation debrief: Flight Operations Director Pier Paolo Emanuelli sits, at right, while Spacecraft Operations Manager Nic Mardle writes on the whiteboard.



Release date: 22 January 2010