 |  |  |  |  |
| |  | |  | |
 |
Europe's Spaceport Overview of Europe's SpaceportAriane launch campaignAbout French GuianaAttend a launchWho's who at Kourou ESA at Europe’s SpaceportCNES at Europe's SpaceportArianespace at Europe's SpaceportEuropean industry at the SpaceportLaunches Next launchLaunch updateMultimedia Image galleryVideo galleryRSS feeds Services
|  |  |  |  | | | Spaceport preparation campaign
 | | | Galliot ground station used to track the Ariane launchers | The main ground facilities at the Spaceport that support an Ariane-5 flight are:
- the trajectography system used in the first phases of flight to monitor the launcher’s trajectory
- radars
- launcher telemetry acquisition system
- flight safety system - a remote control system able to destroy the launcher in flight if the trajectory is not nominal
- meteorological centre to provide weather forecasts before each flight
- optical systems to provide technical high-speed images of liftoff
- telecommunication systems to allow worldwide connections
All these facilities are checked and configured 10 days before liftoff to ensure they are able to support the launcher flight. Finally, three days before liftoff, a full-scale rehearsal takes place to test all systems. Last update: 4 June 2004 | |
|  | Launch campaign Launcher campaignSatellite preparation campaignVideos  Watch a launch countdown WindowsMedia (1.4 MB)Watch a launch countdown Quick Time (3.1 MB)
|