ESAHomeEGNOSGalileoEvolution
   
About Galileo
Why Europe needs GalileoWho's involved in Galileo?Galileo technology developmentsGalileo : a constellation of 30 navigation satellites
Documentation
Open service signal - specificationsGalileo factsheet (PDF)IOV factsheet (PDF)FOC factsheet (PDF)
Technology developments archive
GSTB-V1 Technology DevelopmentsGalileo technology developments
Subscription
Subscribe
Services
Calendar
 
 
 
Bookmark and Share
 
 
 
 
News printer friendly page
GIOVE A satellite (artist impression)
GSTB-V2/A satellite (artist's impression)
First Galileo satellites six months from launch
 
9 June 2005
Two experimental satellites are being developed for the Galileo System Test Bed – Version 2, which will make up the first phase of in the 'in-orbit validation' of the Galileo system. Both spacecraft are now approximately six months away from launch.
 
The main mission of these first Galileo satellites is intended to secure the Galileo frequency filings, validate new technologies for operational use, characterise the radiation environment of medium earth orbit that the operational satellites will occupy and enable experimentation with live Galileo signals. To ensure the success of this phase, two satellites have been ordered from industry, currently known as GSTB-V2/A and GSTB-V2/B, and they are being built in parallel. They are the first step towards the 'in-orbit validation' phase, which will require a constellation of four satellites.  
 
GSTB-V2/A payload bay under construction
GSTB-V2/A payload bay under construction
Satellite assembly and test
 
GSTB-V2/A is being developed by Surrey Satellite Technology Ltd (UK). Galileo Industries (GaIn) is developing the GSTB-V2/B satellite. GaIn is a European consortium including Alcatel Space Industries (F), Alenia Spazio (I), Astrium GmbH (D), Astrium Ltd (UK) and Galileo Sistemas y Servicios (E).

Much of the testing of the units and subsystems that will make up the two spacecraft has been completed. Both satellites are now being assembled and prepared for their environmental tests, which ensure that the satellite is able to withstand the stress of launch and that it will operate correctly in space. GSTB-V2/A will be transported to the European Space Research and Technology Centre (ESTEC) to undergo testing early in the summer. GSTB-V2/B, currently being assembled at Astrium in the UK, will begin its test campaign at Alenia in Rome before moving to ESTEC for final testing in the autumn.
 
 
GTTB-V2/B payload module under test
GTTB-V2/B payload module under test
ESA payload procurement
 
In GSTB-V2, the European Space Agency (ESA) has direct responsibility for the procurement of all of the GTSBV2/B payload units and some of the GSTB-V2/A payload units. The other part of the GSTB-V2/A payload is a parallel signal generation chain developed by SSTL, the satellite prime contractor.

The units procured by ESA include:

  • rubidium frequency standards (both satellites)
  • a passive hydrogen maser (GSTB-V2/B)
  • clock monitoring and control units (both satellites)
  • navigation signal generation units (both satellites)
  • frequency generation and upconversion units (both satellites)
  • solid state power amplifiers (GSTB-V2/B)
  • output filters and diplexer (GSTB-V2/B)
  • navigation antennas (both satellites)
The flight versions of all units have been successfully delivered to the satellite prime contractors and production of the spare units is in progress.
 
 
Ground facilities
 
In parallel with the construction of the two spacecraft, the ground facilities required for controlling the satellites and performing the validation experiments are being developed and tested.

The primary ground systems for GSTB-V2/A are located at the Chilbolton Observatory and Rutherford-Appleton Laboratory in the UK. The control centre for GSTB-V2/B is at Fucino in Italy.
 
 
Launch
 
Preparations for the launch of both satellites have been initiated. Soyuz vehicles will launch both spacecraft from the Baikonur cosmodrome in Kazakhstan. An inspection of the launch facilities was completed in April. The launch of the first Galileo test satellite is currently scheduled for December this year.
 
 
Additional information about the Galileo programme is now available on the European Space Agency web portal. A new navigation menu on the right hand side of the Galileo pages gives access to the following subject areas:

  • First stages of Galileo
  • In-orbit validation
  • Full deployment
  • Galileo specifications

 
 
 
 
Related news
Galileo: contracts for the first satellitesContract signed for launch of two experimental Galileo satellitesGalileo In-Orbit Validation contract is signed
Related links
Galileo (ESA)Galileo Joint Undertaking (GJU)SSTL - GSTB-V2AEuropean Satellite Navigation IndustriesESTEC Test Centre
 
 
 
   Copyright 2000 - 2011 © European Space Agency. All rights reserved.