ESAHomeEGNOSGalileoEvolution
   
About Galileo
Why Europe needs GalileoWho's involved in Galileo?Galileo technology developmentsGalileo : a constellation of 30 navigation satellites
Documentation
Open service signal - specificationsGalileo factsheet (PDF)Galileo IOV factsheet (PDF)Galileo FOC factsheet (PDF)
Technology developments archive
GSTB-V1 Technology DevelopmentsGalileo technology developments
Subscription
Subscribe
Services
Calendar
 
 
 
Bookmark and Share
 
 
 
 
News printer friendly page
GSTB-V1 processing centre
GSTB-V1 processing centre
First prototype of Galileo ground segment
 
21 April 2004
In a major step in the ground segment development of the Galileo program, the first stage of the Galileo System Test Bed (GSTB-V1) has been completed. It supports experimentation on the critical performances behind the services to be delivered to users by the final Galileo system.
 
The GSTB-V1 processing centre has been set up at the European Space Agency (ESA-ESTEC) in The Netherlands. The aim is to solve the issues surrounding positioning, timing and integrity by making use of existing navigation data. These data are collected from a globally distributed network of sensor stations established in co-operation with the International GPS Service and Universal Time Coordinated (UTC) community.

A GSTB-V1 website (www.gstb-v1.esa.int) is now online for specialists in the field of navigation and integrity. It provides GPS measurements and associated generated core products. This data provides invaluable feedback to the Galileo development teams in terms of confidence in achieving the performances of the operational system and consolidation of system design allowing mitigation of the development risks and acceleration of the schedule to meet the time to market.

A European consortium lead by Galileo Industries is carrying out the GSTB-V1 project. In a workshop they ran at ESA-ESTEC last week they presented to the user community the validated results coming out of the commissioning period: the Galileo broadcast navigation message meets the demanding target accuracy of 65 cm, the experimental Galileo System Time is accurate to within less than 1 microsecond with the Universal Time Coordinated and provides the required target stability. This is a solid basis on which the integrity experimentation can start in support of the design of the Safety of Life service.

GSTB-V1 is the first stage of the Galileo System Test Bed (GSTB). The second stage (GSTB-V2) consists of two experimental satellites. These are being built by Galileo Industries and Surrey Space Technology Limited respectively and are planned for launch by end 2005.

Galileo is an initiative of the European Commission and the European Space Agency. Galileo will be a global navigation satellite infrastructure under civil control. It will ensure European sovereignty in future traffic management services and many other application areas.  
 

 
 
Related news
Galileo becomes a reality for EuropeESA welcomes setting-up of Galileo Joint UndertakingGalileo: contracts for the first satellitesContract signed for launch of two experimental Galileo satellites
Related links
Galileo System Test Bed (GSTB-V1) websiteGalileo website (European Commission)European Satellite Navigation Industries
More about...
What is Galileo?Why Europe needs GalileoWho's involved in Galileo?Market prospects and business opportunitiesGalileo technology developments
 
 
 
   Copyright 2000 - 2012 © European Space Agency. All rights reserved.