• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • Esperia Mission

    • Human Spaceflight and Exploration

    • Astronauts

    • International Space Station

    • Esperia Mission
    • About the mission
    • Why Esperia?
    • Daily activities
    • Mission facts
    • Node 2
    • About Node 2
    • Meet the crew
    • Paolo Nespoli
    • Pamela Melroy
    • George Zamka
    • Scott Parazynski
    • Douglas Wheelock
    • Stephanie Wilson
    • Clayton Anderson
    • Expedition 16
    • Downloads
    • Factsheets (pdf)
    • Newspaper (pdf)
    • Esperia Mission live
    • ESA Television
    • NASA TV web streaming
    • Multimedia
    • Esperia gallery
    • Node 2 gallery
    • Services

    ESA > Our Activities > Human Spaceflight > Esperia

    Daily activities

    Mission Summary

    ESA astronaut Paolo Nespoli will be undertaking experiments as part of the Esperia mission though these are not shown in the timeline below. The following timeline is also subject to change.

    Flight Day 1 - Launch

    • Launch
    • Checkout of Shuttle robotic arm
    • Switch on Node 2 'Launch-to-Activation' Heaters

    Flight Day 2

    • Shuttle heat shield check using robotic arm
    • EVA preparations including EVA suit checks
    • ISS rendezvous preparations

    Flight Day 3 - Docking

    • Rendezvous and docking including Shuttle backflip manoeuvre
    • Preparations for EVA 1
    • Unberth robotic arm extension to provide clearance for unberthing Node 2 during EVA 1
    • EVA astronauts 'campout' in Quest Airlock to help remove nitrogen from bloodstreams

    Flight Day 4 – EVA 1

    • Retrieve and stow S-band Antenna Support Assembly; Detach Node 2 heater cables and remove cover from Node 2 aft berthing mechanism; Stow grapple fixture on Node 2; Disconnect Z1/P6 truss fluid lines; Install shrouds on P6 radiator and Sequential Shunt Unit.
    • Move and attach Node 2 to Node 1 left-hand docking port with Station robotic arm.
    • Pressurise area between Node 1 and Node 2 hatches, perform leak check, open Node 1 hatch.

    Flight Day 5

    • Attach cabling between Node 1 and Node 2 and activate shell heaters
    • Enter and set up Node 2, establish ventilation
    • Shuttle heat shield survey
    • EVA 2 preparations
    • EVA astronauts 'campout' in airlock

    Flight Day 6 – EVA 2

    • Disconnect Z1 to P6 truss cables; Unbolt P6; Outfit outside of Node 2 with handrails, worksite interface fixtures, gap spanners and install thermal covers; Remove Node 2 berthing mechanism restraints; Install grapple fixture on Node 2; Configure squib firing unit on S1 truss for deploying radiators; Configure router and replace failed circuit breaker on S0 truss.
    • Manoeuvre P6 truss with Station robotic arm to handoff position
    • Install Centerline Berthing Camera in Node 2
    • Install portable breathing apparatus and fire extinguisher inside Node 2

    Flight Day 7

    • Deploy thermal control radiators on S1 truss
    • Hand P6 truss from Station robotic arm to Shuttle robotic arm, move Mobile Transporter to end of truss, hand P6 truss back to Station robotic arm
    • Node 2 outfitting
    • EVA 3 preparations
    • EVA astronauts 'campout' in airlock

    Flight Day 8 – EVA 3

    • Bolt P6 truss to P5 truss, attach P5 to P6 cabling, remove P6 radiator restraint and cover on Sequential Shunt unit and deploy radiator, relocate main Bus Switching Unit from Shuttle cargo bay to External Stowage Platform 2
    • Deploy P6 solar arrays
    • Node 2 Outfitting

    Flight Day 9

    • Shuttle/ISS transfer operations
    • EVA 4 preparations
    • EVA astronauts 'campout' in airlock
    • Crew conference

    Flight Day 10 – EVA 4

    • Further inspection of Solar Alpha Rotary Joint

    Flight Day 11

    • EVA 5 preparations
    • EVA astronauts ‘campout’ in airlock

    Flight Day 12 – EVA 5

    • Disconnect and stow cables from Destiny to Pressurised Mating Adapter 2; Remove cover on Node 2 forward docking mechanism, demate avionics cables, and release fluid tray bolts; Temporary stow CETA light on Destiny; Configure cables for power transfer for S0 truss/Node 1/Zvezda and Pressurised Mating Adapter 1/Zarya. Retrieve Baseband Signal Processor from Z1 truss. Release bolts on P1 Nitrogen tank Assembly

    Flight Day 13 - Undocking

    • Undocking
    • Station flyaround
    • Shuttle heat shield survey

    Flight Day 14

    • Landing preparations

    Flight Day 15 - Landing

    • Landing preparations
    • Deorbit
    • Landing

    Last update: 30 October 2007

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    3
    facebook
    twitter
    reddit
    google plus
    digg
    tumbler
    digg
    blogger
    myspace

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · CryoSat hits land
    • · Ariane 5 completes seven launches …
    • · Measuring skull pressure without t…
    • · Malargüe station inauguration
    • · The solar wind is swirly
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions