• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • Human Spaceflight and Exploration

    • Node-3 & Cupola

    • Columbus

    • International Space Station

    • Astronauts

    • General info
    • Node-3, the most modern module of the ISS
    • Cupola, ISS Observation Module
    • Node-3 systems and internal racks
    • STS-130 flight timeline
    • Technical info
    • Node-3
    • Cupola
    • Water Recovery System Racks
    • Oxygen Generation System Rack
    • Air Revitalization System
    • Waste and Hygiene Compartment
    • T2 Colbert Treadmill
    • advanced Resistive Exercise Device
    • Europe and ISS
    • ISS and Europe’s Major Contributions
    • Taking the ISS to the next level: ISS exploitation and ELIPS
    • Downloads
    • Information Kit (pdf)
    • STS-130 Daily Activities (pdf)
    • Multimedia
    • Image gallery
    • Video gallery
    • Services

    ESA > Our Activities > Human Spaceflight > Node-3 & Cupola

    Node-3 systems and internal racks

    ESA's Node 3 ready for launch to the ISS

    For launch, five of the eight rack locations in Node-3 will be taken up with two avionics racks and three racks containing pallets with equipment and cargo for the ISS. The three other locations are empty.

    In its final on-orbit configuration, Node-3 will look slightly different. Cupola will be relocated to the Earth-facing port during the STS-130 mission. The three cargo pallet racks will be removed and returned on Shuttle flight STS-131 in March 2010. In the place of these three racks and the three empty rack locations will come six new racks that are already on the Station. These include the second Air Revitalisation System rack for air-composition monitoring and carbon dioxide removal; an Oxygen Generation System rack for oxygen and water; Water Recovery System Racks 1 and 2 for urine and water processing; a Waste and Hygiene Compartment Rack for crew waste and hygiene processing and a second treadmill.

    Node-3 will also be outfitted with the Advanced Resistive Exercise Device for the crew. All these racks and equipment are required since the ISS crew number was increased from three to six in the spring of 2009.

    For more detailed information about the racks, click the links on the left.

    Racks can be easily transported inside the Space Station.

    Node-3’s atmosphere is controlled in terms of air pressure, temperature, humidity, velocity, and particulate and microbial concentrations. Node-3 provides a pipe network for the distribution of water (for fuel cells, drinking, waste and processes) between Node-1 and Node-3 and within Node-3. It also provides the line for the transfer of pre-treated urine from the Waste and Hygiene Compartment to the Water Recovery System racks inside Node-3.

    Special lines and sectioning devices distribute oxygen and nitrogen. Fire detection is provided by two cabin smoke sensors and monitoring of electrical equipment. Other smoke sensors are used in specific racks. Fire suppression within predefined internal enclosures is by portable fire extinguisher.

    Two avionics racks accommodate almost all the electronic units for the command and data handling, audio and video functions, and for the conversion and distribution of the electrical power from the ISS solar arrays to the internal and attached elements. Command and control functions, as well as fault detection isolation and recovery algorithms, are provided by Node-3’s computers.

    Last update: 1 February 2010

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    14
    facebook
    twitter
    reddit
    google plus
    digg
    tumbler
    digg
    blogger
    myspace
    • Node-3 & Cupola
    • Node-3 and Cupola interviews
      • A room with a view for the International Space Station: Completion of the Cupola observation module
      • Also visit
      • Thales Alenia Space
      • Building the ISS
      • Where is ISS now?

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · CryoSat hits land
    • · Ariane 5 completes seven launches …
    • · Measuring skull pressure without t…
    • · Malargüe station inauguration
    • · The solar wind is swirly
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions