• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

    • For Educators

    • For Kids

    • ESA

    • SMOS

    • Earth Explorers

    • Observing the Earth

    • Living Planet

    • SMOS at a glance
    • An Earth Explorer
    • Mapping soil moisture and ocean salinity
    • Improving our understanding of the water cycle
    • Introducing a novel use of technology
    • Facts and figures
    • About the satellite

      • Platform
      • Instrument
    • About the launch

      • Launch site
      • Launcher
    • SMOS in orbit

      • After liftoff
      • Data
    • Meet the team

      • Achim Hahne, Project Manager
      • Susanne Mecklenburg, Mission Manager
      • Matthias Drusch, Mission Scientist
      • Jordi Font, Co-Lead Investigator
      • Yann Kerr, Co-Lead Investigator
      • Manuel Martin-Neira, Instrument Principal Engineer
      • Guillermo Buenadicha, Payload Operations Engineer
      • Andrés Borges, EADS CASA Espacio Payload Project Manager
      • Roger Jegou, Launch Campaign Manager
      • Norrie Wright, Payload Data Ground Segment Manager
    • Multimedia
    • Image gallery
    • Videos
    • Online resources

    ESA > Our Activities > Observing the Earth > SMOS

    SMOS opens arms

    A happy team after a job well done
    25 March 2008

    As part of the final stage of its testing programme, the last of the three arms that make up the SMOS instrument has been successfully deployed – a tricky operation since the three-metre long arms are not designed to open under the influence of gravity.

    ESA's SMOS (Soil Moisture and Ocean Salinity) Earth Explorer mission is currently undergoing final testing at Thales Alenia Space in Cannes, France where it has successfully passed a stringent series of mechanical and thermal tests. However, to ensure that all the acoustic, vibration and thermal vacuum tests had not damaged the delicate mechanism that gently opens the three-segment instrument arms once the satellite has separated from the launch vehicle, each of the arms was tested one by one.

    MIRAS antenna deployment
    MIRAS antenna deployment

    Throughout the testing programme, the three arms of the Microwave Imaging Radiometer using Aperture Synthesis (MIRAS) were folded and tightly clamped together in launch configuration. This innovative instrument is made up of a central hub and three deployable arms, each of which has three segments. The instrument's key elements – 69 antenna receivers, which are capable of observing moisture on the land and salt in the oceans, are equally distributed over the three arms and central structure.


    As the arms are designed to open in space – away from the strong pull of the Earth's gravity field, the testing procedure involved the individual segments being attached to a 'zero-gravity jig', which compensates for the force of gravity. Unlike earlier tests, this series of deployment exercises was carried out with 'live pyros'. These are the electro-explosive charges that cut the bolts of the hold-down and release mechanisms once the satellite reaches orbit. The opportunity was then also used to measure the mechanical shocks caused by this relatively violent operation, and compare them to the test levels that had been applied to the subsystems in their qualification programme.

    Knowing that the MIRAS arms are in full working order means that final preparations can continue for the launch of ESA's water mission next year.

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    23
    Tweet
    • Related articles
      • SMOS shakes again
        • In preparation for data from SMOS
          • ESA mission highlighted at remote sensing conference
            • SMOS instrument and platform unite
              • ESA's water mission instrument passes test programme
                • Noise - no problem for SMOS
                • In depth
                  • SMOS
                  • Related links
                  • Thales Alenia Space
                  • CNES
                  • EADS-CASA

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · Proba-V opens its eyes
    • · First new Galileo satellite arrive…
    • · Next destination: space
    • · Leak repaired on International Spa…
    • · After Chelyabinsk: European expert…
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions