• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

      • Media
      • ESA TV
      • Videos for professionals
      • Photos
    • For Educators

    • For Kids

    • ESA

    • Venus Express

    • ESA Science

    • Europe goes to Venus

      • Tribute to the cryptic planet
      • Penetrating an impenetrable world
      • Past missions to Venus
    • About Venus Express

      • Venus Express mission facts
      • Venus Express objectives
      • The spacecraft
      • Orbiter instruments
      • The launcher
      • Operating Venus Express
    • About Venus

      • Venusian geography
      • The surface
      • Acid clouds and lightning
      • Greenhouse effect, clouds and winds
      • Venus compared to Earth
    • Meet the team

      • International collaboration
      • Project Manager: An interview with Don McCoy
      • Project Scientist: An interview with Håkan Svedhem
      • Launch Campaign Manager: An interview with Michael Witting
      • Spacecraft Operations Manager: An interview with Andrea Accomazzo
      • Venus Express Flight Control Team
      • Principal Investigators
    • Multimedia
    • Venus Express images
    • Venus Express videos
    • VideoTalk
    • 3D Flash 'model'
    • Build a model (pdf)
    • Wallpapers
    • Screensavers
    • Services
    • Comments

    ESA > Our Activities > Space Science > Venus Express

    Venus Express propulsion and electrical system tests

    Venus Express in Hazardous Processing Facility, Baikonur
    6 September 2005

    Activities taking place in Baikonur, Kazakhstan, over the last two weeks have been focused on getting the ESA Venus Express spacecraft ready for the critical propellant loading activity, which is due to start on 24 September.

    These first tests were a verification of the spacecraft's propulsion system and a basic electrical and functional check of the spacecraft.

    Teams have been working extended hours on several occasions to stay on the planned schedule, and the tests were completed successfully and on time.

    Back on 8 August, the spacecraft and all its ground support equipment were first unpacked after arrival and set up in the Hazardous Processing Facility. This is where the engineers ensured that the Venus Express propulsion system and pressurising mechanisms were functioning correctly.

    The propulsion system tests started on 11 August and ran to 15 August. These included operation of all valves of the propulsion system, including the flow control valves of the 400-Newton thrust main engine, to be used for the Venus Orbit Insertion manoeuvre, and the smaller 10 Newton reaction control thrusters (RCTs) required to control the attitude of the spacecraft.

    Then all branches of the propulsion system were pressurised, including the high-pressure helium tank and the two propellant tanks which will carry the fuel and the oxidiser, to check for leaks.


    Venus Express in Payload Processing Facility, Baikonur

    The spacecraft was then moved to the Payload Processing Facility on 16 August for electrical and functional testing, including on-ground simulation of actual mission scenarios.

    This testing was carried out between 17-27 August. It involved the verification of the basic functioning of all spacecraft subsystems, such as:

    • the power subsystem, for example, checking it would provide all other on-board units with regulated electrical power from either the solar array wings or the three lithium-ion batteries;
    • the Data Management System (DMS), the on-board computer system that is the ‘brain’ of the spacecraft which both distributes commands to and collects telemetry from all other on-board units;
    • the Attitude and Orbit Control and Measurement System (AOCMS), including all sensors of the spacecraft’s attitude and motion, and actuators that control the attitude and pointing;
    • the Telemetry, Tracking & Commanding subsystem which will relay all spacecraft telemetry to, and receive telecommands from, the Mission Operations Centre at ESOC.

    The final flight version of the on-board software was uploaded to the spacecraft's central computer memory, to allow mission simulation testing to be carried out. This is where the spacecraft’s sensors are fed simulated data in terms of the attitude and solar illumination conditions (in a so-called ‘closed loop’ configuration) and the ‘reaction’ of the spacecraft to this perceived environment is monitored by the specialist teams.

    The next planned activity is the ‘end-to-end’ verification of communications and operations – meaning that links will be tested from the Mission Operations Centre (MOC) at ESA's European Space Operations Centre (ESOC), in ESOC in Darmstadt, Germany, through to the spacecraft in Baikonur.

    In this test, ESOC are actually taking command of the spacecraft and remotely operate and monitor it for a five-day period from 29 August to 2 September, so that the engineers can confirm that the ground stations and Venus Express can ‘talk’ properly to each other over the course of the mission.

    Rate this

    Views

    Share

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5
    Rating: 0/5 (0 votes cast)

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    8
    Tweet
    • Looking at Venus
    • Launch replay
    • Venus Express launch
    • Related articles
      • Venus Express performs flawlessly, LEOP complete
        • Venus Express mission operations update
          • "Venus Express, give me a GO/NO GO for launch..."
            • Venus Express: ready for lift-off
              • Green light for Venus Express launcher fuelling
                • Venus Express countdown activities started
                  • Venus Express moved back to launch pad
                    • Venus Express set for transport to launcher assembly building
                      • Venus Express mated with upper-stage
                      • More about...
                      • Status reports
                      • Launch in detail
                        • Venus Express factsheet
                        • Related links
                        • Starsem - the Soyuz
                        • Venus Express operations
                        • Cebreros station webcam

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • G+
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · Rare merger reveals secrets of gal…
    • · Watching for hazards: ESA opens as…
    • · ESA astronaut Timothy Peake set fo…
    • · Space drives e-mobility
    • · Proba-V opens its eyes
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions