 |  |  |
| | | Overview |  |
| |
| |  | |
| | OPS Forum - 2009
We've moved! Access the new OPS Forum site at: http://www.amiando.com/opsforum. The 'OPS Forum' is a monthly seminar organised by the Ground Systems Engineering Dept., known as 'OPS-G', at ESA's European Space Operations Centre (ESOC), Darmstadt, Germany. Events are of interest to registered members of the space operations community, academia and the media. |
|
|
|
| |
| |  | |
| | New OPS Forum site and URL Access our new OPS Forum site in Amiando.com.
| |
| |  | |
| | Strategic Directions for Simulator Infrastructure 18 September 2009
Access full details in the new OPS-G Forum site.
| |
| |  | |
| | |  | Recent in-orbit fragmentations and their impact 28 August 2009
An unprecedented series of in-orbit fragmentation events have occurred in the past two years. This presentation will introduce ESA's collision avoidance process, which monitors conjunctions between ESA satellites and other objects, and review recent events.
|
| |
| |  | |
| | |  | ESTRACK Monitoring and Control 3 July 2009
The monitoring and control of spacecraft is the most visible activity of ESOC. However, monitoring and control (M&C) of the ESTRACK ground stations also plays an important role in this process, with a strong focus on remote and automated operations.
|
| |
| |  | |
| | |  | Introduction to the ESTRACK Management System 19 June 2009
The EMS translates service requests from multiple missions into a schedule for ground stations and monitors both execution of the schedule and general health of ground stations.
|
| |
| |  | |
| | | |
| |  | |
| | |  | Swarm simulator development 8 May 2009
An explanation and illustration of what SMP-2, REFA and EGOS-MF are - and how these can be used to facilitate and streamline the production of spacecraft simulators.
|
| |
| |  | |
| | |  | Libration point orbits 3 April 2009
ESA's Herschel and Planck missions will fly on orbits around the libration point L2 in the Sun-Earth system. Future astronomy missions such as GAIA and JWST will also use this type of orbit. This forum will provide a comprehensive introduction to the basic mechanics of libration point orbits.
|
| |
| |  | |
| | | |
| |  | |
| | |  | New Ground Segment Reference Facility 04 February 2009
Testing and validation of the ground segment and ground segment components are prerequisites for operations success. To improve the current approach, OPS-G is working on an innovative concept that will allow developers to validate and demonstrate their system in a pre-operational environment.
|
| |
| | |  |
| |  | |
| | Last update: 30 September 2009 | |