ESAHomeAstronautsInternational Space StationResearchEducationExploration
   
About the International Space StationISS exploitation and ELIPS
Current status
Where is the International Space Station now?
Building the ISS
ISS configuration at completion (pdf)
Europe's partners
International Space Station Legal FrameworkEurope's partners
European participation
ISS ElementsOn the groundEuropean Participating StatesHow much does it cost?
Services
CalendarSubscribe
 
 
 
Bookmark and Share
 
 
 
 
Feature printer friendly page
Building the International Space Station
 
ISS Assembly
 
ISS weigh almost 400 tonnes and covers an area as big as a football pitch. It would have been impossible to build ISS on the ground and then launch it into space in one go; there is no rocket big enough or powerful enough. To get round this problem the Space Station was taken into space piece-by-piece and gradually built in orbit, approximately 400 km above the Earth's surface. This has required more than 40 assembly flights.
 
A partnership between 10 European countries (represented by ESA), the United States (NASA), Japan (JAXA), Canada (CSA) and Russia (Roscosmos), the ISS is the world's largest international cooperative programme in science and technology to date.

In the following list the ISS assembly flights are coded with a number and a letter: A stands for America, R for Russian, E for European and J for Japanese. UL is 'Utilisation Flight', LF means 'Logistics Flight' and ULF is an abbreviation from 'Utilization and Logistics Flight'.  
 
Zarya and Unity
1998

1 A/R
20 November: The ‘Zarya’ Control Module, Russian Proton rocket

2A
4 December: The ‘Unity’ Node with two pressurized mating adapters, Space Shuttle Endeavour (STS-88)

1999

2A.1
27 May: Logistics and supplies, Space Shuttle Discovery (STS-96)
 
 
Unity, Zarya and Zvezda
2000

2A.2a
19 May 19: Preparations for the ‘Zvezda’ Service Module, Space Shuttle Atlantis (STS-101)

1R
12 July: The Zvezda Service Module, Russian Proton rocket

2A.2b
8 September: Logistics and supplies, Space Shuttle Atlantis (STS-106)

3A
11 October: The Z1-Truss, a 3rd pressurized mating adapter and a Ku-band antenna, Space Shuttle Discovery (STS-92)

2R
30 October: The first Expedition crew launched aboard a Soyuz spacecraft

4A
30 November: The P-6 Truss, Space Shuttle Endeavour (STS-97)
 
 
US Destiny Laboratory
2001

5A
7 February: ‘Destiny’ Laboratory Module, Space Shuttle Atlantis (STS-98)

5A.1
8 March: Logistics and supplies with Leonardo Multi-Purpose Logistics Module, Space Shuttle Discovery (STS-102)

6A
19 April: Racks to the Destiny Laboratory with the Raffaello MPLM and Canaradm2, Space Shuttle Endeavour (STS-100)

7A
12 July: Joint Airlock, Space Shuttle Atlantis (STS-104)

7A.1
10 August: Logistics and supplies, crew exhange, Space Shuttle Discovery (STS-105)

4R
14 September: ‘Pirs’ Docking Compartment, Russian Soyuz rocket

UF-1
5 December: Racks to the Destiny Laboratory with the Raffaello MPLM, Space Shuttle Endeavour (STS-108)
 
 
ISS seen from departing STS-113
2002

UF-2
5 June: Payload and experiment racks to the Destiny Laboratory with the Leonardo MPLM and Mobile Base System for the Station's Mobile Servicing System, Space Shuttle Endeavour (STS-111)

9A
7 October: First starboard truss segment (S1), Space Shuttle Atlantis (STS-112)

11A
23 November: First port truss segment (P1), P6 solar arrays deployed and activated, Space Shuttle Endeavour (STS-113)

2005

LF 1
26 July: Supplies and equipment with the Raffaello MPLM, Space Shuttle Discovery (STS-114, Shuttle's Return to Flight mission after Columbia accident)
 
 
The International Space Station
2006

ULF 1.1
4 July: Supplies and equipment with the Leonardo MPLM, Space Shuttle Discovery (STS-121). ESA astronaut Thomas Reiter as Expedition 13 crewmember.

12A
9 September: Second and third starboard truss segments (P3/P4), pair of solar arrays and radiator, Space Shuttle Atlantis (STS-115)

12A.1
9 December: Third port truss segment (P5), logistics and supplies with a SPACEHAB cargo module, Space Shuttle Discovery (STS-116)
 
 
ISS configuration before STS-120
2007

13A
8 June: Second and third starboard truss segments (S3/S4), pair of solar arrays, Space Shuttle Atlantis (STS-117)

13A.1
8 August: Third starboard truss segment (S5), supplies and equipment with a SPACEHAB cargo module, Space Shuttle Endeavour (STS-118)

10A
23 October: The European-made Node-2 Harmony module (for attaching the European Columbus laboratory and the Japanese Kibo laboratory), Space Shuttle Discovery (STS-120)
 
 
ISS viewed from the Space Shuttle on 28 November 2008
2008

1E
7 February: ESA’s Columbus laboratory, Space Shuttle Atlantis (STS-122)

1J/A
11 March: First pressurized component of the Japanese Kibo laboratory, Space Shuttle Endeavour (STS-123)

1J
31 May: Second pressurized module and robotic arm of the Japanese Kibo laboratory, Space Shuttle Discovery (STS-124)

ULF2
14 November: Supplies, equipment and spares with the Leonardo MPLM, Space Shuttle Endeavour (STS-126)
 
 
ISS after STS-128 mission
2009

15A
15 March: Final starboard truss segment (S6) and final solar array pair, Space Shuttle Discovery (STS-119)

2J/A
15 July: Experiment Module Exposed Facility and Experiment Logistics Module Exposed Section for the Japanese Kibo laboratory, Space Shuttle Endeavour (STS-127)

17A
28 August: Life support and science racks with the Leonardo MPLM, Space Shuttle Discovery (STS-128)

5R
12 November: The Russian Mini-Research Module-2 (MRM2), launched by Soyuz rocket from the Baikonur Cosmodrome on 10 November

ULF3
16 November: Supplies and spares, Space Shuttle Atlantis (STS-129)

2010

20A
8 February: Node-3 ‘Tranquility’ and Cupola, Space Shuttle Endeavour (STS-130)

19A
5 April: Supplies and science racks with the Leonardo MPLM, Space Shuttle Discovery (STS-131)

ULF4
14 May: Integrated Cargo Carrier and the Russian-built Mini-Research Module-1, Space Shuttle Atlantis (STS-132)

2011

ULF5
24 February: Permanent Multipurpose Module Leonardo and Robonaut 2, Space Shuttle Discovery (STS-133)

ULF6
16 May: AMS-02 and supplies, Space Shuttle Endeavour (STS-134)

ULF7
16 May: Supplies, equipment and spares with the Raffaello MPLM, Space Shuttle Atlantis (STS-135)
 
 

ISS as seen from Soyuz TMA-20
 
2012 (planned)

R3
May: Multipurpose Laboratory Module with European Robotic Arm (ERA), Russian Proton rocket
 
 

 
 
Related links
NASA: International Space Station Assembly
 
 
 
   Copyright 2000 - 2012 © European Space Agency. All rights reserved.