Ariane 5 on the mobile launch table. The blue truck tug is in front of the table, partly visible behind the table is special support equipment that provides cooling and power while the launcher is on the move. This support equipment rides on one of the two sets of rails that link the Ariane-5 final assembly building with the launch zone. The launch is scheduled for 12 July 2001.
Photo:ESA/CNES/Arianespace