United space in Europe
Team training
Enabling & Support

XMM team training

08/12/2016 619 views 5 likes 370653 ID
  • HI-RES JPG [2.07 MB]

Thank you for liking

You have already liked this page, you can only like it once!

As part of this process, the flight control team returned to ESA’s large, general-purpose Main Control Room at mission control in November – the first time since launch in 1999 – for five days of intensive simulations. The team usually works from a smaller, dedicated room shared with the Integral and Gaia mission teams.

The simulations checked the procedures that will be used for moving the fuel and for reconfiguring XMM for working beyond 2017.

  • ESA
  • Operations
  • XMM-Newton
  • ESA engineer Spacecraft Operations Manager ESA Operations Manager
  • ESOC ESOC ESOC Main Control Room ESOC Main Control Room
Team training
Enabling & Support

Team training

Image 830 views 5 likes
Team training
Enabling & Support

Team training

Image 529 views 2 likes
Swarm mission team in training
Enabling & Support

Swarm mission team in training

Image 845 views 4 likes
Marcus Kirsch
Enabling & Support

M. Kirsch

Image 647 views 4 likes
Sentinel-2A team
Enabling & Support

Sentinel-2A team

Image 952 views 9 likes