2003: On 18 September 2003, the last preparations for ESA's SMART-1 spacecraft were made in Europe's Spaceport in Kourou, French Guiana, to make it ready for its launch the following week.
SMART-1's Solar Array protections were removed and the space capsule made ready for flight. It was then enclosed by a 2.6 metre 'raising cylinder' on which was placed the second spacecraft to be launched at the same time, E-Bird. The previous day, 17 September, SMART-1 had been placed on top of its Ariane 5 launcher.
Modh meán
16 September
15 September
14 September
Fan suas chun dáta
Liostáil lenár nuachtlitir chun an nuacht is déanaí, nuashonruithe misin, agus léargas eisiach a fháil go díreach i do bhosca isteach. Bí ar an gcéad duine a bheidh ar an eolas faoinár dtionscadail agus ár ndul chun cinn atá le teacht.